News   Apr 01, 2026
 126     0 
News   Apr 01, 2026
 361     0 
News   Apr 01, 2026
 630     0 

GO Transit: Service thread (including extensions)

Buddy you neglected to understand the fact that you would need to electrify a corridor for a few trains a day.
You could use RDC's or sumitomo DMU's.
Thing known as battery power equipment with charging station at the station using pans.

Yes you can use DMU, but not a fun ride over an hour. Rode one from Copenhagen to Hamburg back in 2012
 
Thing known as battery power equipment with charging station at the station using pans.
Again infrastructure $$. A two car DMU that can carry 200 people is a lot more efficient than if those people drive. Start there. Get people out of their cars. We don't even have trains running. We don't even own the trackage. You want to start paying the host railways to put charging equipment at stations?
If it can make it from Brampton to London without changing that may make sense. But if something happens on the way and the train runs out of juice that's not a reliable solution.
 
How do you know that the hydrogen version isn't coupled to a gear box?
Who said anything about hydrogen? The Nippon Sharyo trains used by the UPX could only be configured with DMU or EMU traction power.

And the poster with whom you were debating was referring to battery powered trains with charging stations.
 
... or the JR Hokkaido DMV. :) Yes, the Nippon Sharyo DMU's transmission makes it feel like a bus. I don't understand how they can pass off a Nippon Sharyo DMU (which is a DHMU / hydraulic) as convertible to a EMU. If the DMU was a DEMU (diesel-electric) then I could see it.
 
Let’s hope there’s no major TTC disruptions on this day: View attachment 512013
Well….

1697496938233.png
 
This an example where a section of a train is cut off from the KW train using EMU. As that section departs west, another section from the west is arriving and couple onto the KW train to be the same length going to Union like it arrived at KW.

An 3 section EMU would have more than enough capacity to handle the ridership. As ridership increase, you could move to an 4-5 section train.
What does the train length matter if the host railroad/station owner won’t provide access?
 
Metrolinx theoretically could've added a provision for a future tunnel when they sold off the land adjacent to Danforth GO, but instead they sold it for a quick buck without any community benefits whatsoever, in potentially one of the most shortsighted selling of a piece of land we have witnessed in recent times.

There's now a development proposal for Main Square where the city could theoretically work with the developer to secure such a provision, but it doesnt really make much sense anymore since Metrolinx dropped the ball on their end. Unfortunately that was pretty much the last "affordable" option to create any logical connection between Main Street station and Danforth GO, so I dont see the connection ever being improved between the two.

Even a pedestrian walk way somewhere through Main Sq Community Centre, or Canadian Tire parking lot would make that connection easier (no climbing the ramp only to walk back down a potentially icy slippery slope to get to Main). Problem is that the self store garages are in the way.
 
Even a pedestrian walk way somewhere through Main Sq Community Centre, or Canadian Tire parking lot would make that connection easier (no climbing the ramp only to walk back down a potentially icy slippery slope to get to Main). Problem is that the self store garages are in the way.

No they are not, they're demolished. That's the site of the 6 Dawes Apartments by Fitzrovia, now under way.

However, there is no tunnel incorporated into the design for that site, so far as I'm aware.

****

I think a tunnel at the stage of various proposals is a serious challenge and questionable use of funds, for reasons discussed in multiple other threads.

But we can certainly address icy conditions by having a snowmelt system put under the sidewalk/path between the two stations, in relative terms, that's cheap.

In the medium term, there is a need to remove that really good Shwarma place at the corner to create a more reasonable capacity and streetscaped sidewalk between Danforth and Main Station.

If we can just get, decent width, decent lighting, decent wind mitigation and snowmelt, then I think we've made that connection a lot more pleasant; all for a fraction of the cost of a tunnel.
 
No they are not, they're demolished. That's the site of the 6 Dawes Apartments by Fitzrovia, now under way.

However, there is no tunnel incorporated into the design for that site, so far as I'm aware.

****

I think a tunnel at the stage of various proposals is a serious challenge and questionable use of funds, for reasons discussed in multiple other threads.

But we can certainly address icy conditions by having a snowmelt system put under the sidewalk/path between the two stations, in relative terms, that's cheap.

In the medium term, there is a need to remove that really good Shwarma place at the corner to create a more reasonable capacity and streetscaped sidewalk between Danforth and Main Station.

If we can just get, decent width, decent lighting, decent wind mitigation and snowmelt, then I think we've made that connection a lot more pleasant; all for a fraction of the cost of a tunnel.
How about an above ground covered walkway?
 
But we can certainly address icy conditions by having a snowmelt system put under the sidewalk/path between the two stations, in relative terms, that's cheap.

There is certainly enough room to have a roofed and somewhat enclosed structure between the south side of Danforth and the GO station that would meet your (very reasonable) climate mitigation suggestions.

1697588837659.png


In the medium term, there is a need to remove that really good Shwarma place at the corner to create a more reasonable capacity and streetscaped sidewalk between Danforth and Main Station.

Expropriation would be somewhat costly, but one has to assume that someone is assembling land on that northeast corner block and some sort of development will ensue. Certainly a setback would be achievable in a negotiated development package. One wonders if a tunnel from the south side corner to the mid-level of the subway might actually be achievable if and when the corner building is demolished and an excavation happens. Probably a wait and see proposition.

1697588978479.png


- Paul
 

Back
Top