I am unsure what the issue is with the Milton Line. If Metrolinx offered to build more track, I don’t know why CP would say no.
Your "if" statement sums it up perfectly. CP has accommodated GO to the degree that the current tracks will allow. Lots would change...... if ML brought funding for adding track and other improvements.
Some of those improvements are non-track.... ie grade separation. The issue with the grade separations being other than crossing protection..... but rather, the likelihood that major roads would be blocked for unacceptable periods of time if CP tried to run more GO trains (especially bidirectionally) with its freights mixed in.
Some of those improvements sit with Metrolinx, also. The length of single track east of Dupont is a barrier to frequent two-way service. There would have to be more track east of Dupont.