vegeta_skyline
Senior Member
Just a couple of updates;
Re-alignment of the mainlines between Oakville and Clarkson begins this weekend. They'll only be 1 track in service during this time. Finally we're getting close to having all 3 tracks up and running.
Also, we've gotten the go-ahead to operate MP-40 (engines) trains at their maximum speed of 93mph as of this week. There will be early arrivals (by a couple of minutes) at some stops, but we can't leave early so the time savings won't be cumulative over the entire trip length. As official schedule changes cannot be made system wide until all the old engines are removed from service, which may be a while yet...
Re-alignment of the mainlines between Oakville and Clarkson begins this weekend. They'll only be 1 track in service during this time. Finally we're getting close to having all 3 tracks up and running.
Also, we've gotten the go-ahead to operate MP-40 (engines) trains at their maximum speed of 93mph as of this week. There will be early arrivals (by a couple of minutes) at some stops, but we can't leave early so the time savings won't be cumulative over the entire trip length. As official schedule changes cannot be made system wide until all the old engines are removed from service, which may be a while yet...