crs1026
Superstar
Some signs of work at West Harbour. Appears that they are clearing the area around the end of the current track in preparation for grading. No signs of rail on site yet, but with the CN yard right there, I can't really distinguish between rail ready for installation and general rail being stored at the yard.
Those trucks appear to be dewatering something underground. I don't see any sign they are about to finish the grading, although there are piles of granular material there.
When it's track time, the switch(es) will come in as prebuilt panels. Won't be hard to spot. But, I'm predicting another layer of subgrade to be poured before that.
- Paul




