The vision was 3 tracks to Galloway, but future-proofing for 4 tracks to Durham Junction. A future third track was also planned east of there to the Bowmanville extension, interchangeably being shoehorned north of the Kingston Sub and overtaking the northern CN track and building a new one for freight on the south side. But that was 10+ years ago, things were in flux, and I know there was a lot of hand-wringing about the lack of a third track progressing for the eastern MSF at that time. Incredible it is taking this long.