ProjectEnd
Superstar
Kitchener Four Track update:
I don't see that it needs to be wider. Much of Eastern has 2 lanes and 2 bike lanes - and no widening plans. Simply finish it and extend the existing lanes.Does the wider only refer to the trains, or will there be any roadway widening? Would be nice for the bike lanes on Eastern to continue here and link up to Broadview to get down to the future Portlands.
Metrolinx is accepting Submissions for the Design of the New South Platform and Modifications to the Existing South Platform at the Brampton GO Station. Scope of
services include detailed design, assistance with design and evaluation process, construction supervision contract administration and tender evaluation, and post
construction services.
I don't think anyone has posted photos of the expanded bridge over Woodbine on the Lakeshore East and Stouffville lines (IIRC). From this afternoon. It looks like they still need to attach railings on the north side of the new bridge.
View attachment 501181View attachment 501182View attachment 501183
No recent photos, but there was some posted by @enter username back in May - https://urbantoronto.ca/forum/threa...-metrolinx-various.9023/page-798#post-1951389I don't think anyone has posted photos of the expanded bridge over Woodbine on the Lakeshore East and Stouffville lines (IIRC). From this afternoon. It looks like they still need to attach railings on the north side of the new bridge.
No recent photos, but there was some posted by @enter username back in May - https://urbantoronto.ca/forum/threa...-metrolinx-various.9023/page-798#post-1951389
Progess has been very efficient, with very little impact to Woodbine. I commented back in May thatt hey must have built the original bridge with the thought of being able to add a 4th track eventually - there's very little work required on the abutments; it's mostly the new centre pillar (and span) that's been added.
I know Mx would scream 'outside of scope' but I would love to have seen the opportunity taken to raise the bike lanes to sidewalk height here, separating them from cars under the rail bridge and lessening the impact of the surrounding hills.
Halfway height ... as the overpass looks to low for bike clearance at sidewalk level. Don't need cyclists faceplanting into the side of it![]()
Have we seen preliminary designs? I'm still surprised they're going to the south side, mostly to do with CN's appetite for tracks closer to the offices there.Contract awarded for design services for new Brampton GO South Platform on MERX. This would be to accommodate the new 3rd track through downtown Brampton.
From the tender:
Have we seen preliminary designs? I'm still surprised they're going to the south side, mostly to do with CN's appetite for tracks closer to the offices there.
I use it all the time. It's a complete non-issue - unless your head also hits all the streetcar wires!Halfway height ... as the overpass looks to low for bike clearance at sidewalk level. Don't need cyclists faceplanting into the side of it![]()
Have we seen preliminary designs? I'm still surprised they're going to the south side, mostly to do with CN's appetite for tracks closer to the offices there.




