Had a look at Agincourt and Millikan stations today and very limit in getting shots.
Agincourt east platform is pour with framing up over it. Stairs and elevator close off or enclose at about 75%. Still putting up sound barrier wall at the south end.
Only can gain access the the west temp platform from the south as the north end close and starting to work on the new platform now the old station is gone.
Edge material base being install for the roof framing.
Most of the south retaining wall completed for Steeles underpass with some sidewalk pour.
Only a small section of earth to be remove by the north support for the RR track to get thing read to start forming and pouring the retaining wall for the westbound lanes and sidewalk. There will be enough room to put in 4 lanes until the north side is done to have the new road connect to each end existing road.
Agincourt east platform is pour with framing up over it. Stairs and elevator close off or enclose at about 75%. Still putting up sound barrier wall at the south end.
Only can gain access the the west temp platform from the south as the north end close and starting to work on the new platform now the old station is gone.
Edge material base being install for the roof framing.
Most of the south retaining wall completed for Steeles underpass with some sidewalk pour.
Only a small section of earth to be remove by the north support for the RR track to get thing read to start forming and pouring the retaining wall for the westbound lanes and sidewalk. There will be enough room to put in 4 lanes until the north side is done to have the new road connect to each end existing road.