GO Transit: Construction Projects (Metrolinx, various)

I've long thought that Allandale station would be a great spot for a gateway to cottage country. While more bus connections is always a positive I don't think it would work for most cottage goers/campers due to the inherent nature that they are spread out across Muskoka/Kawarthas and beyond. My dream is that a car rental company sets up at the station with opening hours that coincide with train times. (This would also be useful at Oshawa GO as well).
It would make more sense to extend trains on the Bala Sub. The stations are already in place, Washago, Bracebridge, Gravenhurst, Huntsville, North Bay. All you need is to have a he train run at time people want to travel. Something the Northlander didn't do.
 
It would make more sense to extend trains on the Bala Sub. The stations are already in place, Washago, Bracebridge, Gravenhurst, Huntsville, North Bay. All you need is to have a he train run at time people want to travel. Something the Northlander didn't do.

Yes but this would not be a practical service for GO hence why ONR ran it.
 
It would make more sense to extend trains on the Bala Sub. The stations are already in place, Washago, Bracebridge, Gravenhurst, Huntsville, North Bay. All you need is to have a he train run at time people want to travel. Something the Northlander didn't do.

Wrong subdivision - that's the Newmarket sub.
 
Any sense on why they would be doing this? Is this confirmed? @smallspy

View attachment 275346

In typical Metrolinx fashion, they are redoing something that they had previously and recently undone.

The original connections at Canpa (the railway point where the lines connect) allowed for two paralleling movements. When Metrolinx purchased the Canpa Sub from CP, they "rationalized" it to a single connection, in order to save on maintenance and to make the resignalling of the interlocking easier when it came time to exend the fourth mainline track from Mimico.

Of course, this "rationalization" caused many delays to the trains during the Lakeshore West detours of 2 years ago (it was that long ago?!?). And so in the post-work wrap-ups, they identified a need for a second connection. I guess they've finally found the time to do it now.

Dan
 
In typical Metrolinx fashion, they are redoing something that they had previously and recently undone.

The original connections at Canpa (the railway point where the lines connect) allowed for two paralleling movements. When Metrolinx purchased the Canpa Sub from CP, they "rationalized" it to a single connection, in order to save on maintenance and to make the resignalling of the interlocking easier when it came time to exend the fourth mainline track from Mimico.

Of course, this "rationalization" caused many delays to the trains during the Lakeshore West detours of 2 years ago (it was that long ago?!?). And so in the post-work wrap-ups, they identified a need for a second connection. I guess they've finally found the time to do it now.

Dan

Well it’s great to see the Canpa interlocking restored to its “former glory”.
 
In typical Metrolinx fashion, they are redoing something that they had previously and recently undone.

Are they adding just one of these back or both?
canpa2020.png
 
Are they adding just one of these back or both?

I went down there this morning to see if I could figure out what’s being done. Canpa is a hard place to get close to (legally) but from what I could see, the activity was all west of the Canpa interlocking where concrete ties are going in on T3. I saw no signs of any changes on the north side. Rails at Horner were in their usual rusty state. Trains have been using T1 all weekend which would not be the case if your (A) was being built. Nor did I see any sign of signals work. Makes no sense to upgrade the Canpa plant without doing something about Approach signalling on the Canpa.

AFAIK the bridge replacement at Dufferin is a future project with no procurement done or approved start date. Doesn’t seem logical that ML would release funds for related workjust yet. But....Metrolinx. Others may know more.

- Paul
 
Are they adding just one of these back or both?
View attachment 276006

Your item labeled "A" is the second connection to the Canpa Sub - and is the one that they apparently would like to replace.

"B" has never existed, but frankly would make a huge amount of sense to do as it would allow for paralleling movements involving tracks 2-to-3 and 3-to-4.

Dan
 
"B" has never existed, but frankly would make a huge amount of sense to do as it would allow for paralleling movements involving tracks 2-to-3 and 3-to-4.

Google Maps air photo from 2005 shows a service track branching off track 3 between the two crossovers to tracks 2, going through where the signal bungalow is now, with another right-hand crossover from track 3 east of those, east of which it followed today's track 4. The 2007 air photo shows the part west of that crossover removed already. Though it wouldn't have been useful for GO anyway as non-main track.

Anyway I'd love to see more layouts like this across the network. Especially through Brampton so that the three-track sections could actually be used as such.
 
That track 1 is on both side of the exiting Weston station and has been in place almost a year. Once they built the new platform 4 or will it become 1 after the track, track will be place between the 2 ends in 2021.

Track 1 is in place to the crossover plant east of Islington.
 
Oct 04
Metrolinx Stouffville Line 2nd Track Expansion At Huntingwood Drive Grade Crossing. Easy to do a grade separation here.
50465079712_cfaa8d5ee0_b.jpg

50464222753_5f6abd4357_b.jpg


Agincourt GO Station and lot more up on site.

They have started grade work north of the station with the existing platform gone to bring track 2 down to the new platform and station. At the rate they going, it will be summer 2021 before platform 2 is ready and no elevator in place for the platform and the new station. The new station platform is too narrow for my taste. If they plan on opening platform 2, accessibility riders will have to walk to the crossing to get to the platform.
50464921921_a63b611a87_b.jpg

50464225238_6aa3705f56_b.jpg

50465083417_466f8c4f2a_b.jpg

50464227053_1a7dba5fae_b.jpg

50465084787_30bbd86eda_b.jpg

50464926886_f05418eb14_b.jpg

50464228658_43a9421c60_b.jpg

50464928016_135f20dae4_b.jpg

50464230418_06b9d63b2a_b.jpg

50465088362_bc283f542a_b.jpg

50465089702_a53ffc4a35_b.jpg

50465089977_c2c3499f48_b.jpg

50464232668_3612471fc6_b.jpg

50464931616_2429c3120e_b.jpg
 
Last edited:
That track 1 is on both side of the exiting Weston station and has been in place almost a year. Once they built the new platform 4 or will it become 1 after the track, track will be place between the 2 ends in 2021.

Track 1 is in place to the crossover plant east of Islington.

I think the person was saying a 4th track, not track 4. So not sure what the point of the comment was.
 
Oct 04
Lot more up on site. They finally have the maintenance building almost built at the south end of the parking lot near the platform. Most of the east platform is built and working on the east stair to the new underpass.

With the bridge in place over Steeles, track work is underway for track 1 with track to to be place on the bridge after the bridge is seal and ballast. Could be a weekend end in Nov or Dec that will see no service on the line and Steeles close to traffic so the existing line can be place across Steeles and connecting to the tracks on that side. Also shifting of track 2 back in place will take place as well. Once done, then the excavation can start to remove the earth under the bridge for the new underpass.

Once track 2 is shifted back into place, work can get underway for building the stair to the underpass as well the new platform.
50465911232_d0cdb6bd8e_b.jpg

50465911122_721f06c769_b.jpg

50465754361_23331eef51_b.jpg

50465910202_789656a5e4_b.jpg

50465753076_a915c7db3c_b.jpg

50465752671_a452c72208_b.jpg

50465052663_441ecda262_b.jpg

50465905627_2510f96ae4_b.jpg

50465753896_d7be1ff9c1_b.jpg

50465057268_422ce1a37a_b.jpg

50465913457_408e500a0e_b.jpg

50465759711_8d00099fe6_b.jpg

50465061458_5470055332_b.jpg

50465917242_e26f714831_b.jpg

50465760816_f4269a0865_b.jpg

50465761416_cf9a5f4ea4_b.jpg
 