rbt
Senior Member
For those that are interested here are a couple of links for bridge status on the Welland Canal. So everyone can understand how busy the canal is when the Seaway is not frozen over
http://www.greatlakes-seaway.com/R2/jsp/R2.jsp?language=E&loc=NiaBrdgStatus.jsp
http://www.greatlakes-seaway.com/en/navigating/map/index_wel.html
Thanks for the links. If this morning is a typical day (I've refreshed a couple times over the last 3 hours) it would seem Metrolinx ought to be able to schedule 1 or 2 guaranteed 10 minute windows per hour for their bridge. So long as they're scheduled in advance and part of the seaway schedule, the boats ought to be able to time their arrival around it so nobody is delayed.