Adjei
Senior Member
That was during a time when there wasn't as much interest in transit. I dare any politician to fill in an under construction transit tunnel now.
@Adjei has the measure of the time. 2017 is very different from 1995.That was during a time when there wasn't as much interest in transit. I dare any politician to fill in an under construction transit tunnel now.
That was during a time when there wasn't as much interest in transit. I dare any politician to fill in an under construction transit tunnel now.
They filled in an already tunnelled section of the Eglinton Subway in 1990. We are safe from nothing.
They filled in an already tunnelled section of the Eglinton Subway in 1990. We are safe from nothing.
Exactly. The party is running on fiscal conservatism, which means framing any public spending as "if it doesn't benefit me directly it is a waste" is okay.
'That was 1995, this is 2017. Things are different now' doesn't work in politics, as we have seen many times recently.
So it is outside of the fare paid area. Would new gates be installed or the old gates (and collector box) moved?Breakout wall is what you look at directly when you enter the station from the northwest corner of Finch and Keele.
View attachment 130604
The LRT station site is basically empty save for some construction equipment storage. Can't wait for this corner to be completed.
View attachment 130605
Breakout wall is what you look at directly when you enter the station from the northwest corner of Finch and Keele.
View attachment 130604
The LRT station site is basically empty save for some construction equipment storage. Can't wait for this corner to be completed.
View attachment 130605
Safe from what? Surplus cars can
Gas plants.....pearson redevelopments....helicopter orders........But gas plants!
Gates moved.So it is outside of the fare paid area. Would new gates be installed or the old gates (and collector box) moved?
Here here.The LRT station site is basically empty save for some construction equipment storage. Can't wait for this corner to be completed.