nfitz
Superstar
But then they'd have had a LOT more motivation to do something about it for the 2015 Union-Pearson opening.In some ways I’m glad that it waasn’t designed and built back before RER came along. Had it been designed back when GO was a peak only service, it might have proved a bit too rudimentary for the hub that is being built today.
And ultimately adding elevators for the AODO compliance in 2-3 years time.