Allandale25
Senior Member
Whats the status on this?
Tweet to GO Expansion they might provide an update.
Whats the status on this?
If you tag David Miller, that normally gets a response - as he enjoys making fun of Metrolinx on this issue.Tweet to GO Expansion they might provide an update.
I think they've been pushing out something similar annually since 2012 or so; perhaps earlier.I moved into the neighborhood where the tunnel would go in 2018. Every year I’ve been here Metrolinx has teased that things will begin the following year.
It was in response to a question just above, that nobody could answer.Like for your contribution, but throwing stuff at the screen for the idea that they still haven't wrapped design and that this is being pushed out at least one more year.
Im pretty sure that one is officially off the table and wont ever be happening. I remember Metrolinx saying something to the extent of "it's infeasible due to some kind of infrastructure constraint". Which is probably fodder and BS, because you can likely get around that with enough engineering but it would cost $$$.The Main-Danforth connector will be the winner. Mark my words! LOL.
Rube Goldberg, is that you?Everyone needs to stop complaining because the existing connection to the UPX is great! You just need to exit Dundas West TTC station, cross at the lights, turn left, turn right, then up-up-down-down-left-right-left-right, walk through Freshco, ask the staff in the back if you can wheel your suitcase through the warehouse, hop off the loading dock, cut a section out of the chain-link fence, over the tracks and hoist yourself up onto the platform. Easy-peasy.