OneCity
Senior Member
^ However, I don't mind if they simply extend SSE to Sheppard, for better connectivity with buses coming from the north.
By the time design is complete on Sheppard and politicians kick the ball 10 to 20 years will fly by. Its politically inevitable this line will be built, even Jen Keesmaat was afraid to put LRT on her map but acknowledges the connection. Extending he SSE to Sheppard may allow the is line by toyed with for longer, which inevitably mean raising costs thru inflation for something inevitable. IMO it should be in a que with the DRL long in the lines that follow the current three in design
Last edited: