This is such a waste of everybody's time. The PC's want to build a 3 stop subway, so a massive bus station will no longer be needed at STC, meaning the whole station would be redesigned.
 
This is such a waste of everybody's time. The PC's want to build a 3 stop subway, so a massive bus station will no longer be needed at STC, meaning the whole station would be redesigned.
So just keep the phase 1 bus terminal and not bother with the phase 2 expanded one?
 
I'd rather sheppard get extended to warden then reopen this debate/planning.
That's an additional 2 scarborough subway stops technically keeping the PCs promise as well as fixing the sheppard issue of getting over the 404.
 
Am I reading the plans correctly, the platforms are going to be side platforms (with 3 escalators and 2 elevators each)? From what I read about with Woodbine Station being the temporary terminus, side platform terminal stations are confusing. Although, we are in the "21st Century" now and computer controlled screen, escalators, announcements could reduce the confusion, I'm just surprised they went with this instead of all the centre platforms on the TYSSE.
Concourse Level.png

Platform Level.png


Edit: Here's the reasoning:
The platform level is situated 25 m below the proposed grade on Borough Drive; it is a side platform configuration to suit the double track alignment within the large single-bore tunnel. Vertical circulation to the concourse level is set behind the platforms along with support spaces to maximize the platform capacity and reduce the overall length of the station box.
 

Attachments

  • Concourse Level.png
    Concourse Level.png
    214.5 KB · Views: 308
  • Platform Level.png
    Platform Level.png
    159.1 KB · Views: 306
Last edited:
Except that isn't whythis station is so big

Exactly.

This station isn't as big as it is to future proof it, nor is it for safety reasons. I'm sure those are factors to some small extent.

The station is this big because it basically has to redirect bus routes over a massive area to this location to make the station 'viable'.
 
What's the change in total bus routes from today?

Also, SC today doesn't have enough room to accommodate additional services like GO and Durham BRT.
 
You are missing my point... you need the big above ground exits otherwise those large stations cannot safely evacuate in an emergency. If you have a one small staircase leading to the surface you are screwed if all hell breaks loose.
that is not what people mean they are talking about the ridiculous ceiling heights and in the public areas that don't effect entering or exiting the action in any way whatsoever.
 
probably catering to the group of people that say they don't feel unsafe on a cntre patform
SCC not being centre platform is due to the alignment passing under the Frank Fubert Woods which the City said they wouldn't tare up. This makes it impossible to install the necessary track infrastructure for the center platform station as the TTC would need to dig up the woods. This is also why the crossover point for the trains will be after SCC instead of before it, resulting in what will be a stupidly inefficient station. However even then I do question why the crossover is after the station considering its a single bore tunnel, so both tracks are in the same tunnel, so a cross over can be easily installed; all the TTC needs to do is not put a dividing wall in the tunnel like they are considering.
 
SCC not being centre platform is due to the alignment passing under the Frank Fubert Woods which the City said they wouldn't tare up. This makes it impossible to install the necessary track infrastructure for the center platform station as the TTC would need to dig up the woods. This is also why the crossover point for the trains will be after SCC instead of before it, resulting in what will be a stupidly inefficient station. However even then I do question why the crossover is after the station considering its a single bore tunnel, so both tracks are in the same tunnel, so a cross over can be easily installed; all the TTC needs to do is not put a dividing wall in the tunnel like they are considering.

Having the crossover after the station would mean the trains will drop off the passengers, maybe wait before entering the crossover, switch tracks, and then re-enter the station on the other side to pick up passengers. Think it would be more efficient.
 
Having the crossover after the station would mean the trains will drop off the passengers, maybe wait before entering the crossover, switch tracks, and then re-enter the station on the other side to pick up passengers. Think it would be more efficient.
Oh, that actually makes sense. I guess there won't be any significant platform confusion then. Will all three escalators be going in the same direction for each platform then, and use stairs to go opposite direction?

This almost confirms this:
AM Peak Platform.png
 

Attachments

  • AM Peak Platform.png
    AM Peak Platform.png
    154.4 KB · Views: 320
Last edited:
Having the crossover after the station would mean the trains will drop off the passengers, maybe wait before entering the crossover, switch tracks, and then re-enter the station on the other side to pick up passengers. Think it would be more efficient.
The problem is that this halves the stations possible throughput as now only 1 Kipling bound train can occupy the station at any given time. Secondly all it takes is 1 delayed train on the drop-off side and the Bloor-Danforth is crippled (we'll be turning back trains at Kennedy because SCC is unusable in this scenario). Having the crossover before SCC means that both platforms can have Kipling bound trains, and if one platform is out of use the other still remains. Functionally nothing changes as far as passenger movement is concerned but operational speed and efficiency is decreased and redundancy is reduced to zero.
 
The problem is that this halves the stations possible throughput as now only 1 Kipling bound train can occupy the station at any given time. Secondly all it takes is 1 delayed train on the drop-off side and the Bloor-Danforth is crippled (we'll be turning back trains at Kennedy because SCC is unusable in this scenario). Having the crossover before SCC means that both platforms can have Kipling bound trains, and if one platform is out of use the other still remains. Functionally nothing changes as far as passenger movement is concerned but operational speed and efficiency is decreased and redundancy is reduced to zero.
What if there is a crossover built at one of the emergency exits?
 
What if there is a crossover built at one of the emergency exits?
The crossover dosen't need to be that far out, it can be right before the station like at any terminus. You can see here in this picture of the Fukutoshin Line outside of Shibuya station that the X crossover is in the single bore tunnel. There is no reason this can't be done at SCC. It's only when the line splits into 4 tracks to serve the 2 center platforms that the line enters the Cut and Cover section.
 