44 North
Senior Member
If I understand you, this is what you suggest.
I assume SRT would be different trains than GO, so on the LSE, you are saving space to 2 tracks for SRT, and 2 tracks would be for all GO service. Would a 3rd track even fit (5 total). I would assume with RER to Markham and Pickering, 4 tracks would be needed for Metrolinx.
That is why I considered going beyond Kennedy as well, but essentially following the Gatineau Hydro corridor and the Don Valley. I would expect that the conventional DRL would need full service on the north leg if it were to actually relieve Yonge.
Well since you and KC are already talking about the fantasy options, this is one I've thought about for years and would stand behind. And besides we got almost 3km of existing ROW through SC between Stouff Sub and McCowan Yd, then another +2.5km from there to Progress/Sheppard effectively set aside. Pretty sizable, and a bad thing to waste. Since RL is still in a fairly malleable, dynamic stage hard not to consider combining the two. How I'd envision the connection would be via Ellesmere and CP RoW (but as subway so not on any mainline). Big bonus is it travels on a diagonal so in a way can capture more riders, but also offers a good compromise between both any Sheppard RT option and SSE.