Are there any plans for a better Beltline - Bayview connection near Brickworks? I ask because I encountered some marked cycle connections here that are notably dangerous. It seems like a pretty common desire path for northbound/southbound travel, since the two trails diverge more east/west once reaching this area. Now take a look below where some maps recommend crossing to bridge the trail gap.
Bike Share map:
View attachment 573125
Looking Southbound:
View attachment 573123
Looking northbound:
View attachment 573124
The Bayview MUP runs entirely on the east side of traffic. In this particular spot, the path splits from the road to travel underneath the Bayview Bloor ramps to DVP. Continuing to ride on Bayview (as is a suggested cycling route) would mean riding the shoulder with no barrier, crossing multiple slip lanes with 60+ km/h traffic and sight lines often reduced by twists in the roads and tree coverage.
Now I can’t see many mistakenly missing the safer route unless they’re coming from the Beltline trail. The only safe connection between these two trails requires a little detour into Brickworks followed by the signalled crossing at its entrance. It’s not obvious in the trail, the various cycling maps will convince you the shortest passage is in the middle of high speed traffic.
I’d like to contact the right people about correcting this on maps or improving the cycle network, but first I’d like to know if anyone has any more context I’m missing.