smallspy
Senior Member
I birefly looked over the document -- THANK YOU SO MUCH FOR FINDING THIS -- and it looks like they are planning on making Zum Queen West and Zum Steeles West into their own routes. What's the point of that? If they want to have lower frequencies on the Western branches then they could just create a short turn routes that dont go west of Main. By keeping two separate routes they are creating an unnecessary linear transfer for folks in west Brampton.
Apparently the frequencies projected east and west of Main are such that one would almost never would be a multiple of the other. As an example, how do you break out the branches if one side needs 6 minute frequencies, but the other 14? It just can't be done in a reliable and cost-effective manner.
That said, through-routing or branching will likely happen at other times when it makes sense to do so.
Dan
Toronto, Ont.