Therion
Senior Member
I was in the area yesterday. No sign of any demo equipment whatsoever, or any sign of any demo having been done. I assume first they will remove the glass panes from the storefronts and windows.
I was in the area yesterday. No sign of any demo equipment whatsoever, or any sign of any demo having been done. I assume first they will remove the glass panes from the storefronts and windows.
This project consists of an 80-storey, 275m high building (the tallest condo building in Canada). The building consists of 132 hotel rooms on 6 floors, 612 residential units on 65 floors, 3 floors of retail and 5 levels of underground parkade for a total floor area of approximately 1.3 million square feet. The project duration includes six months of early works and preconstruction and 36 months of actual construction.
- Of course this is going to be a major tourist draw, what is basically happening is the creation of another media square at Yonge and Bloor, like what is going on at Yonge & Dundas. Kinda like a Toronto verison of Ginza down the road from our Shinuba district. More high class and high end retailers, compared to the low brow stuff down the street the has a more lower common denominator factor. All of those who were disappointed with TLS ( i.e everyone) we have a second chance to create a city defining intersection at Yonge & Bloor.
This project consists of an 80-storey, 275m high building (the tallest condo building in Canada). The building consists of 132 hotel rooms on 6 floors, 612 residential units on 65 floors, 3 floors of retail and 5 levels of underground parkade for a total floor area of approximately 1.3 million square feet.
Like The Hive in Resident Evil
May 29
From Manulife, in the future 1 Bloor East will be visible here south of the Bay building.
Nerd!