News   Nov 22, 2024
 650     1 
News   Nov 22, 2024
 1.1K     5 
News   Nov 22, 2024
 3.1K     8 

Search results

  1. G

    Yonge Street Revitalization (Downtown Yonge BIA/City of Toronto)

    Any idea how the Province's temper tantrum is going to effect the viability of this project going forward @Northern Light ? Are we looking at this project potentially being stalled once again?
  2. G

    Toronto Pinnacle Lakeside (Phase 1) | 174.86m | 54s | Pinnacle | Hariri Pontarini

    Pinnacle seems to have their CM down to an exact science. They move notably faster than others in the city.
  3. G

    Toronto Pearson International Airport

    Because its the Toronto thing to do. I hope they really meant this: https://toronto.citynews.ca/2024/08/31/toronto-pearson-airport-expansion-construction-plan/ This is what JFK and ORD are doing in the next 10 years: (note the Studio Gang terminal for ORD was pushed back to phase 2, SOM...
  4. G

    Finch West Line 6 LRT

    There are two ways to address this: 1) Install crossing gates 2) Reduce operation speeds at crossings Realistically, only one of those options will be viable for administrators in both Edmonton and Toronto. Transit users will be inconvenienced but costs will be kept down as we collectively...
  5. G

    Toronto Billy Bishop Toronto City Airport | ?m | ?s | Ports Toronto | Arup

    Shortening the current runway seems like a very bad idea if the airport is staying for the next 50 years. Wouldn’t that effectively shut down the airport for any commercial operations? Leaving the airport to be suitable only for general aviation purposes? (aka rich folks with private aircraft)
  6. G

    Highway 401 Transit and Auto Tunnel

    Yeah, I don't think any Federal partner is going to want to sign on to this. The likely outcome, if any, of this proposal is that it will be reworked a few times until it eventually dwindles down to being a few tunneled express segments around key interchanges.
  7. G

    GO Transit Electrification | Metrolinx

    Which has worked very well for Zurich for many years. Unless MX is planning super long trains on high frequency corridors, the push-pull config is not going to be that much slower than EMUs.
  8. G

    Highway 401 Transit and Auto Tunnel

    Not to mention the added challenge of keeping a reasonable amount of traffic flow on North America's busiest highway while under construction. Lets assume this is a deep-bore tunnel to address the crossing concerns you highlighted previously. Start adding a few interchanges/exits to make the...
  9. G

    Highway 401 Transit and Auto Tunnel

    This would without a doubt be the most expensive construction project in Canadian history, possibly North America (excluding the nationwide interstate project) I can’t wait for the eventual press leak on IO’s number for the project. Let’s not forget this is the land where bike paths cost 75...
  10. G

    Highway 401 Transit and Auto Tunnel

    Insane. If pursued, there is no way they keep this from going north of 50 billion. Say goodbye to any transit expansion anytime soon if this project becomes a reality.
  11. G

    GO Transit Electrification | Metrolinx

    If the plan is still to run 4 bilevels with one Eloco, the outcome will be roughly the same.
  12. G

    GO Transit Electrification | Metrolinx

    Electrification is easy when you only have one rail line.
  13. G

    Toronto Bike Share

    Maybe its time we allow private bikeshare/escooter services like every other city in Canada?
  14. G

    Zoning Reform Ideas

    Also of note - Edmonton and Calgary are still approving multiple new subdivisions every year, and neither city has a "greenbelt" I do think we can learn a bit from Edmonton on being more ambitious when it comes to multiplex policy though. Edmonton was able to pass a multiplex bylaw that allows...
  15. G

    Finch West Line 6 LRT

    I mean there are many commutes along line 1 and 2 where its faster to drive outside of rush hour. This line increases the viability of living without a car in north Toronto and that's still a win, even if it isn't the fastest option.
  16. G

    Toronto Ontario Line: Osgoode Station | ?m | 1s | Metrolinx | HDR

    Is there a public art program for any of these stations? I'm noticing the huge amount of wall space available in the escalator shaft @Frankietls

Back
Top