afransen
Senior Member
It would be about 6.4km vs 5.4km. For one additional km to add 8 minutes, that average speed on that segment would need to drop pretty drastically. Cooksville to Erindale is currently scheduled at about 6 minutes, or ~55kph average. For 6.4km to take 8 minutes longer would average 27kph. 15 minutes longer would be 18 kph.Those curves alone are probably a 20-30 mph max curve for trains. Would probably end up adding like 8-15 minutes on the travel time alone
I think this kind of investment for Milton would likely see deployment of EMU rolling stock that could handle tunnels and tighter turns a bit better.




