Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

20231024_073136.jpg


Looks like the orange posts are installed at the O'Conner stop.

They look the same as the ones at the underground stations, TTC logo up to, "T" in the middle and Metrolinx logo at the bottom. Not sure if they light up, this was at like 7:30 this morning.

This is on the Victoria Park side, there was another pair of them on the O'Conner side too.
 
View attachment 515197

Looks like the orange posts are installed at the O'Conner stop.

They look the same as the ones at the underground stations, TTC logo up to, "T" in the middle and Metrolinx logo at the bottom. Not sure if they light up, this was at like 7:30 this morning.

This is on the Victoria Park side, there was another pair of them on the O'Conner side too.
A bunch of stops along the surface stretch have them now, and the top half of them do light up when it is dark enough.

Dan
 
Oh this this going to be fun especially for TTC service

Eglinton Crosstown LRT​

Construction Notice
5692fa05-39ce-4499-beba-e6034a51172c.png

One Lane of Alternating Traffic on Eglinton Avenue East between Cowbell Lane and Holly Street​

As early as Saturday, October 28, 2023​

129a1b96-d1af-be35-7177-e9e0639fd5a8.png
What Work is Taking Place?
As early as Saturday, October 28, 2023, crews at Eglinton Station will be performing watermain installation works on Eglinton Avenue East between Cowbell Lane and Holly Street. To facilitate this work safely, eastbound and westbound traffic on Eglinton Avenue East will be reduced to one alternating lane from approximately 9:00 a.m. to 3:00 p.m. between Cowbell Lane and Holly Street. Flaggers and a Paid Duty Officer will be present to help facilitate traffic movements.

Outside of these work hours, one lane of traffic in each direction on Eglinton Avenue East will be reinstated. This work will take place for seven (7) days a week until approximately Sunday, November 5, 2023. Upon completion of this work, short term lane reductions may be required on Eglinton Avenue to facilitate special activities. Please review the complete notice or visit www.metrolinx.com/eglintoncrosstownlrt for more information.

What to Expect
Noise from construction activities can be expected. Concrete barriers, fencing, and signage will be in place to delineate the work zones. One lane of alternating traffic will be in place on Eglinton Avenue East between Cowbell Lane and Holly Street. Traffic control personnel and Paid Duty Officer will be present when this work takes place. Expect delays while traveling through the area.

HOURS OF WORK
• As early as Saturday, October 28, 2023, and ongoing until approximately Sunday, November 5, 2023.
• Work is expected to take place between approximately 9:00 a.m. and 3:00 p.m.
• Work may be rescheduled due to inclement weather or unforeseen circumstances.
• Work may be longer or shorter than expected.

TRAFFIC DETAILS
• Eastbound and westbound traffic on Eglinton Avenue East will be reduced to one alternating lane from approximately 9:00 a.m. to 3:00 p.m. between Cowbell Lane and Holly Street.
• Flaggers and a Paid Duty Officer will be present to help facilitate traffic movements.
• Outside of these work hours, one lane of traffic in each direction on Eglinton Avenue East will be reinstated.

PEDESTRIAN DETAILS
• No changes to the current pedestrian routes are expected as a result of this work.

TRANSIT INFORMATION
• Access to TTC will be maintained at all times.
• Please visit www.ttc.ca for more information.
 
Well, as it happens, I actually happen to agree with Metrolinx that there is no need to have a separate graphic for subway and LRT. All forms of rapid transit should be shown as such - whether it uses sensible old technology or some gadgetbahn nonsense is irrelevant to riders.

There's a big difference between subway and on-street LRT.
 
every video they show of a supposedly completed station gets me more and more incensed on why they still need another year essentially to open....
its almost as if...and stay with me here. They dont actually need another year to open. People keep forgetting this. Its not that they dont know when its going to open, they have a good idea of when.

they just dont want to say a date and be wrong
 
its almost as if...and stay with me here. They dont actually need another year to open. People keep forgetting this. Its not that they dont know when its going to open, they have a good idea of when.

they just dont want to say a date and be wrong
welll by showing videos of virtually complete stations doesnt help their cause. most people see things at face value and they are saying wtf is this station doing finished and empty.
 
Is this considered parking in the bike lane?
View attachment 515809
Normally this is infuriating, in this case not as much. I can appreciate Crosslinx adding this to the streetscape design but it’s functionally useless for now. The paint starts right at the front of the black truck and only stretches to Shortt street.

It’s less than 200m of bike lanes, they’re stubs. The city needs to follow up by filling in the rest between stations.
 
Normally this is infuriating, in this case not as much. I can appreciate Crosslinx adding this to the streetscape design but it’s functionally useless for now. The paint starts right at the front of the black truck and only stretches to Shortt street.

It’s less than 200m of bike lanes, they’re stubs. The city needs to follow up by filling in the rest between stations.
But it always was the city's job.
wasnt the project called complete streets eglinton? They have to wait for crosslinx to finish i guess
 

Back
Top