drum118
Superstar
You will still need DD equipment as well single level to meet future needs like Europe.Honestly I feel like when GO gets EMUs they won’t be double decker.
Seen 4 set of 3 cars of DD making up at as well 3 sets of 5 cars that were pure EMU duel ends. Then seen locomotive at one end with a cab car and 9 DD. Then there was an DD train about 9 cars long with 5 single levels cars.
You get both single level and DD on all 9 systems I saw a few weeks ago and it depends on the lines they are running on as well speed.
Since DB is running GO now, they will most likely do what they do in Germany where they are using both types of cars and makeup of trains. Most likely will add and remove sets of cars along the route to meet the needs at each end. Why send a 12 car train to NF and London when you only need a 3 car train? Same can be said for KW, Barrie and X.




