Toronto Eight Cumberland | 170m | 51s | Great Gulf | a—A

Photos taken July 7th, 2022:

DSC08443.JPG


DSC08446.JPG


DSC08452.JPG


DSC08453.JPG


DSC08459.JPG
 
kind of seems like great gulf built one bloor then used that reputation to make money on a bunch of crap: Home, Yonge and Rich, this one
There is a lot of crap work done at 1 Bloor St E that leaves one shaking their heads. Imagine working in the lobby with 8 degrees of temperature during the winter! I hope GG has learned from their mistakes.
 
They don't take long after pouring the cement. They seem to be moving fast>
View attachment 413906

Wowser these folks are fast. All that formwork and rebar work on top of a new floor poured just yesterday.

Low hanging fruit joke: need to get them to start taking working lunches a block south.
 

Back
Top