7.6K 3 194
Finch West LRT and TYSSE: Finch West Station
|
Finch West subway station is the second station north of the previous northwestern terminus of the Line 1 subway. Part of the Toronto York Spadina Subway Extension (TYSSE), it is opened in December 2017.
The subway station is designed by the same team that designed Black Creek Pioneer Village Station together: IBI Group Architects as Engineers & Architects of Record, with Will Alsop/aLL Design as Design Architect.
Finch West LRT station, the eastern terminus of the new Finch West LRT under construction as of 2019 and targeted to open in 2023, will connect to the subway station. Metrolinx have contracted Mosaic Transit Group to design, build, and maintain the Finch West LRT. Arup are the architects.
Address
Finch Avenue West & Keele Street, Toronto, Ontario
Category
Transit, Public Space / Park
Status
Complete
Completion
2016
Number of Buildings
2
Developer
Mosaic Transit Group, Metrolinx, Toronto Transit Commission
Architect
Arup Canada, aLL Design, Arcadis
Engineering
LEA Consulting
Roofing
LiveRoof Ontario Inc
Services
Fine Line International
Signage/Wayfinding
entro
Other
entro
Email
TYSSE@ttc.ca
Forum
Buildings Discussion | |
Views: 66K | Replies: 245 | Last Post: Sep 03, 2024 |
Member Photos
194 photos |
News