News   Apr 18, 2024
 682     0 
News   Apr 18, 2024
 6K     2 
News   Apr 18, 2024
 2.4K     4 

YRT/Viva Construction Thread (Rapidways, Terminals)

^If Highway 7 is anything to go by, they do work in the middle of the night pretty often. They will often start work at around midnight or 1 am.
 
Yesterday I walked the entire length of Davis Dr to check out the new Viva rapidway.

23315457280_87e22c6d7a_h.jpg


22982997754_5780363135_h.jpg






According to the VivaNext website, the project is close to 80% complete, with landscaping, streetscaping and other finishing touches to be completed in the spring. One thing that is a little different here compared to Highway 7 is that, except at intersections or curbside bus stops, the sidewalks are concrete instead of brick. But nevertheless, the quality of landscaping in York Region are extremely generous for a suburban road. Most downtown streets in North America don't look as good as this.

23502603332_068366f781_h.jpg





Longford station.

23315476720_198fa89bd0_h.jpg






A number of new retaining walls have been constructed after the road widening. Ideally these walls should be knocked down when the properties get redeveloped, but to their credit each wall has a unique design and look fairly decent. All of them have the same black fence at the top, except for the white retaining wall (3rd photo).

23585089766_b19d598f67_h.jpg


23528774471_e45a0aabaf_h.jpg


23502599552_b908388549_h.jpg






Question: why do some planters have a double-height wall next to the road while others don't? Furthermore, this planter also has angled edges while the other planters have vertical edges. Just curious what's the reason for that.

23243254129_d0d9cdf3a1_h.jpg






The bridge over this little creek has the same black fence as the retaining walls.

23315473100_88c19b5ac4_h.jpg





Main station.

23502579252_d605913ca1_h.jpg


23315472200_da62cb67ee_h.jpg
 
Last edited:
Despite all the work done on Davis Dr, the Barrie line is still not grade separated so in a few years we will have more construction to look forward too. It won't be simple either. The new viva station is quite close to the tracks, so raising or lowering the roadway is probably not much of an option. I guess the train tracks will be lowered to go under the road.

22982988764_f8212b77ed_h.jpg


23528769701_72b4c8d2a8_h.jpg





Keith bridge is aesthetically pleasing and even comes with ornamental street lights.

23243249939_22910546e1_h.jpg


23585082666_76e0ed8982_h.jpg


23243234089_9510531134_h.jpg


I'd say it turned out exactly as promised.

vivaNext_DavisDrive_KeithBridge-680x408.jpg





Southlake station.

22982984954_3ec2b713b6_h.jpg


23502589872_50a9502142_h.jpg


22984111713_2c3c0fd2f0_h.jpg


23502587442_52840153e1_h.jpg





The sidewalks here are not finished yet.

23611148205_128d5bd94c_h.jpg





Just east of Southlake, the bus lanes start to transition to mixed traffic. From here on, it's curbside only just like the rest of the Viva network.

23315461890_117a75a532_h.jpg


23611146535_7e59cea272_h.jpg





Leslie street.

22982977424_f72e4e74e4_h.jpg




And the final stop is the GO transit commuter lot at highway 404.

23502582802_17cc9dbea0_h.jpg


23243232809_a90621e4ab_h.jpg




In part 2 of my post, I provide my thoughts on the bus service in the Viva service thread.
 

Attachments

  • vivaNext_DavisDrive_KeithBridge-680x408.jpg
    vivaNext_DavisDrive_KeithBridge-680x408.jpg
    102.7 KB · Views: 970
Last edited:
thanks for the photo update! its nice to see that theyve managed to recycle the G1 stations up here and not dump them in the trash. I guess once Silver and Yellow get launched they will use the old stations too.
Time will tell whether this project will be an investment for the future or a misguided shortfall like Line 4.
 
Thanks for the pictures - I haven't seen the Davis stretch in a while.
So far it appears YR has been on-budget and at least more-or-less on time and the design has really been top notch. Hopefully it will achieve the desired results.
 
Thanks for the pictures - I haven't seen the Davis stretch in a while.
So far it appears YR has been on-budget and at least more-or-less on time and the design has really been top notch. Hopefully it will achieve the desired results.


On that note though, from my experience travelling on Hwy 7 daily, the lack of a right turn lane is proving to be quite a setback as YRT bus stops and turners are jamming up the right lane.
This is especially apparent during the rush hours. Perhaps on their future phases they should consider this as a lesson learned and incorporate a turning/busstop lane
 
Highway 7 is actually the same. The sidewalks are primarily concrete.

I didn't realize. It's been a while since I've been in Markham, however I was in Vaughan less than a month ago and the new sidewalks there appear to be entirely brick. Maybe it's like that only in Vaughan Metropolitan Centre, while everywhere else is mostly concrete?

22659249909_e84db1966d_h.jpg


23051490685_c31b5865e5_h.jpg
 
This looks pretty lackluster compared to what was done on Highway 7, where are the bike lanes?
 

Back
Top