steveintoronto
Superstar
^ That Trackmobile has proven invaluable. I wonder if it will be used on work trains along the line later?
Spring 2019 is the latest in-service date.
Do we have a start date for the construction to Cambridge, or is that not been awarded?
These photos rock! Thanks for taking the time to post.Last Thursday Nov 15th, ION did its first winter night testing. I caught 509 out around 10:00 p.m. and as I headed home I heard on the radio that it was joined by 507 and 505. Reports are that the trio stayed out until 3:30 a.m. (this is why the anticipated last ever GEXR train up the Waterloo spur never happened). Here's a few shots...
Northbound, turning from Francis onto King:
I honestly don't expect it anytime soon with Ford at the helm.
And rightfully so. There is zero business case for a LRT in Cambridge. Bus (with some signal priority) is all that is needed for the foreseeable future. It was just promised (and being acted on) so the 3 mayors could be united in their initial application for funding.
The LRT through Kitchener and Waterloo has relatively low ridership projections, the Cambridge wing is just pure politics with abysmal ridership.
Wynne technically funded it, but it is still in early design processes. I would be surprised if Ford didn't cancel it as it's a pretty large waste of money.
no phase 2Do you mean shut down the constructed LRT? AFAIK it is almost ready to be opened.