Not much action, but nice to hear something is happening!
Well don't expect much, because the project is on hold due to insufficient funding. They have currently secured $43M from the Province, but that is nowhere near the estimated $106M project cost. They are waiting to hear from an application they submitted to the feds for $73.1M from the Investing in Canada Infrastructure Program (ICIP).
From the linked report:
"As outlined in report COR-FFM-21-04/COR-CFN-21-09 dated February 9, 2021, the overall KVTH Project is currently paused pending funding availability. Metrolinx is committed to moving forward with the work within the adjacent rail corridor to relocate their platform to the KVTH site as a critical part of the Kitchener Line expansion in preparation for two-way all-day GO service. As outlined in Report COR-FFM-21-09 dated June 22, 2021, some elements of the Region’s site design are moving forward in parallel with the Metrolinx design work in order to ensure that site circulation, parking, bus loop and passenger pick up and drop off area are coordinated and can be ready for use when Metrolinx is ready to move to the new platform (expected Summer 2023)."
I'm assuming that the "some elements" are the bare essentials which can fit within the $43M they have already secured.
Last edited: