Is this just the testing speed, or the actual operating speed? It looks slow to me.Caught a bit of today's testing on my lunch break as 505 arrived and departed from Waterloo Public Square. The signals at the Erb/Caroline intersection worked alright but the ones in the parking lot were still a bit glitchy...
Is this just the testing speed, or the actual operating speed? It looks slow to me.
Handheld EDACS-compatible radioJune 21
No idea what the plan is for communication, but the driver had a hand-held device that was moved from end to end and clip to the control panel.
Horn is just a testing precaution, they won't use it in service.Found the horn weak for crossing the road.
Yeah you caught them doing testing with one of the 13 new operators that they hired recently. In the cab in the 5th video you posted (from left to right) was one of the test contractors, the lead operator in the back, and the new operator-in-trainingCar was slow arriving at Fairview Station, but it sure jack rabbit departing the station.
6 of 14 are in Waterloo getting Grandlinq's specialized equipment installed, 8 completed in Kingston having Grandlinq's specialized equipment installed in Kingston.How many trains do they currently have?
By running left hand in a couple of sections, one of the huge benefits of dedicated RoW is made clear. The added flexibility of operation will be invaluable later.[...]
The irony of the name is exquisite.