It would be nice to poll the existing riders, giving them 3 options:
1) Extend the subway to Agincourt, and build LRT or BRT east of it.
2) Convert the subway to LRT and build a continuous LRT line, but then the existing subway will have to be closed for 4-6 months for the conversion.
3) Leave the existing subway as is, and build LRT east of Don Mills, with a single-platform transfer.
I imagine that the majority of riders will prefer Option 1. But if Option 1 is too expensive, they will prefer Option 3 since it is less disruptive than Option 2.
I would vote for option 1, although it would be the more expensive than 3. I would guess that the closure for option 2 would be more than 6 months - the SRT closure is 3 years to convert outdoor stations to LRT - and the cost would be no less than option 1. If you ever hope to have frequent, all day rail service (GO REX) through Agincourt, then option 1 starts to look even better.