nightstreak
Active Member
It just occurred to me that as of right now, 5(ish) years away from 3 subway lines and extensions opening virtually simultaneously, the City of Toronto and the TTC still don't have a way to fund their operating costs. I'm wondering if the significant transfer of ridership from buses and streetcars to subway will see an improvement in fare evasion recovery — a $124M problem. Fewer people will be boarding through the current POP (mostly) honour system and more of them will be going through turnstiles. Will that be enough to offset the cost of operating the Ontario Line and the Yonge and Scarborough extensions?




