That's the previous design for the new trains, it's changed slightly since then, mostly at the front end. This image below, from the UT story on the funding for the new trains is the updated look (and was announced a few months ago, i think when the provincial funding was confirmed). Similar overall to the design you posted, but a bit more polished (and distinct from the TRs at the front). Also, lights near the doors to show when they're closing! (like in Montreal, or on the streetcars)My mistake. I misunderstood this announcement. I was under the impression that Alstom already got the contract, and that Thunder Bay was going to manufacture these trains, but it appears that's not the case.
I thought these schematics were confirmed for what the trains would look like on Line 2.
View attachment 615895View attachment 615896
They need to upgrade the signal system.Is there any work that has to be done on Line 2 before they can get these new trains to operate on the line?
Once all the T1's have been completely phased out, will we see the TTC simply have both the original TR's and these new trains operating interchangeably on lines 1,2 & 4?
Well, it's part of the Baseline stream so maybe it doesn't need to be allocated to specific items in the capital budget right now.So what's the other $442 million for - that's hardly a small sum to brush aside?
As I noted above, it has to be done a lot faster than Line 1and before the new trains enter service.They need to upgrade the signal system.
Is there any work that has to be done on Line 2 before they can get these new trains to operate on the line?
They need to upgrade the signal system.
An upgraded signal system is not required for the new trains to run, it's the new trains that are required for the changeover to the new signal system. Since the changeover from old to new fleet would happen gradually over the course of a few years rather than overnight, during that time both old and new fleets would need to share the right-of-way on the same signal system, thus the new trains must be able to be driven manually. The same is true of the TRs on line 1, which entered service years before ATC went live. So any delay in ATC implementation on line 2 should not affect the delivery schedule of the new fleet.As I noted above, it has to be done a lot faster than Line 1and before the new trains enter service.
The TRs are supposed to stay on lines 1 & 4 for the remainder of their service life, and line 2 will consist entirely of the new fleet, however some of the new fleet will also go on line 1 (the add-on batch for the YNSE) and possibly eventually line 4 as well. Of course, it's possible the TRs may occasionally go on line 2 as well, as they have in the past, unless the line 2 ATC won't be compatible with them for whatever reason (apparently line 2 ATC is to be different than that of line 1).Once all the T1's have been completely phased out, will we see the TTC simply have both the original TR's and these new trains operating interchangeably on lines 1,2 & 4?
Not your mistake at all. Freeland herself said they will be built in ThunderBay which was odd since the tender is still out. Other bidders could technically sue for unfair tender practices (already decided Alstom without going thru the proper channels).My mistake. I misunderstood this announcement. I was under the impression that Alstom already got the contract, and that Thunder Bay was going to manufacture these trains, but it appears that's not the case.
I thought these schematics were confirmed for what the trains would look like on Line 2.
View attachment 615895View attachment 615896
As happened to the Azur trains in Montreal - sole sourced to Bombardier, Alstom sued and won, Alstom and Bombardier then joined forces for a combined bid on the contract.Not your mistake at all. Freeland herself said they will be built in ThunderBay which was odd since the tender is still out. Other bidders could technically sue for unfair tender practices (already decided Alstom without going thru the proper channels).
Did the TTC actually evaluate the earlier bids and determine they were compliant and which was lowest?TTC would have known who won the earlier bid that they cancelled because funding wasn't in place. They would also know which bids were compliant.
Do they even have to rebid it? They could simply ask the winning bidder to revise their numbers if necessary. If it's still the low bid, why waste everyone's time?
Wasn’t it just an RFI to shortlist manufacturers? No proposals or price.Did the TTC actually evaluate the earlier bids and determine they were compliant and which was lowest?
Was it? That rings a bell now you say that.Wasn’t it just an RFI to shortlist manufacturers? No proposals or price.
What's wrong with the Line 1 trains? Look pretty sharp to me!Are these line 2 trains 100% going to be metal cattle cars again or could we get fully painted bodies like the rest of the civilized world? (And Montreal)




