T3G
Senior Member
The Queens Quay rebuild was not well thought through at all. What they should've done is expanded the sidewalk on both sides by cancelling the curbside lanes, and leaving the streetcar in the middle of the road as they had before. The traffic capacity would've been the same, but the 509 and 510 could get up to something vaguely resembling speed on the straightaways.




