That Cherry & Lake Shore intersection is a real tough knot to untangle. I assume at one point they were waiting for the results of the Gardiner EA, but that's basically dead now.
The plan for the area does not depend on if the Gardiner stays up or not as it has no real impact on the Keating Channel Master Plan. The Cherry St Bridge does have an impact on how traffic, bikes and LRT will operate at this time.
From what I saw Sat, can't get any good photo shots of this road being rebuilt along with the LRT line.
The work taking place is from Eastern south. Not sure if King to Eastern will follow after the reopening of the new Street or will it take place down the road.
All the tracks are welded as 66' sections, not the normal 300'. I guess this has to do how far these rail have to be transfer from where they are to the site. Easy to load on long trailers and only a few moves to do it.
If the plan remain as is, the new Cherry St extension will continue south where the current Cherry St stop now with a new bridge over the channel.
There is a public meeting on this area.
What: Final Port Lands Acceleration Public Meeting
When:Thursday, May 24th - 6:30pm to 9:00pm
Where: Metro Toronto Convention Centre, North Building
Room 105, Constitution Hall, 255 Front St W