Nope. An additional rezoning was filed with the City a little while ago.

But it doesn't make any sense :)

Are they scarping one the buildings and doubling another.

I really can't see the design working at 30 stories.

Also, what are the odds the city would even permit a 30+ story building right on the water.
 

Architecturefan

Active Member
Member Bio
Joined
Jan 23, 2008
Messages
222
Reaction score
1
Cityzen could probably tell you more, but from what I know its on the northwest portion of the site and the rest of the development is still a-go as planned. Its a big site, they have a fair bit of room to work with. As far as what the City will permit, I guess we'll see, but there's no shortage of precedent along the lakeshore of tall buildings that have been permitted.
 

Solaris

Senior Member
Member Bio
Joined
Jun 22, 2008
Messages
5,688
Reaction score
293
Location
Markham
Site Plan approval and Rezoning applied for:

25 QUEENS QUAY E

Site Plan Approval Application for application for 3 new mixed use building containing retail at grade / residentail above and resident and public parking. - 3 buildings - 2 buildings at 13 stories and 1 building at 35 stories. - 606 units - 708 parking spaces - 4 levels below grade parking - 498 spaces for units - 122 public parking spaces (visitor and retail parking in this calculation)

And:

OPA and Rezoning application for 3 new mixed use building containing retail at grade / residentail above and resident and public parking. - 3 buildings - 2 buildings at 13 stories and 1 building at 35 stories. - 606 units - 708 parking spaces - 4 levels below grade parking - 498 spaces for units - 122 public parking spaces (visitor and retail parking in this calculation).

Cityzen could probably tell you more, but from what I know its on the northwest portion of the site and the rest of the development is still a-go as planned. Its a big site, they have a fair bit of room to work with. As far as what the City will permit, I guess we'll see, but there's no shortage of precedent along the lakeshore of tall buildings that have been permitted.

Thanks DSC & Architecturefan for uncovering details of the mysterious Phases 3+4 is finally revealed ...

I'm not suprised by the 35 storeys tower though as Cityzen has always suggested something similar since Pier 27's first launch~

It all makes sense now on the Site Plan ... so I guess the 2x 13s buildings will be in the middle and the 35s tower will be located on the top left ~

Pier27_sp.jpg

source: http://www.waterlink.ca/siteplan.pdf
 

SP!RE

°°°°°°
Member Bio
Joined
Apr 23, 2007
Messages
3,954
Reaction score
8
Location
Southcore
I guess the days of highrise towers being built on Queen's Quay on the harbourfront are not over!
 

AlvinofDiaspar

Moderator
Member Bio
Joined
Apr 22, 2007
Messages
32,305
Reaction score
26,639
Location
Toronto
Considering they need an OPA and rezoning, I wouldn't count on a revival any time soon. It will be interesting to see the details when it comes out.

AoD
 

Automation Gallery

Superstar
Member Bio
Joined
May 5, 2007
Messages
12,654
Reaction score
3,269
Location
South Parkdale

maestro

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
7,315
Reaction score
2,461
I think he means on the south side of Queens Quay. I say let them have their 35 storey ... heck, give 'em 50 ... for the two 13 storey towers.
 

Eug

Senior Member
Member Bio
Joined
Apr 29, 2009
Messages
2,977
Reaction score
45
Location
Toronto
Does someone have a link to the zoning application for the high rise?

BTW, have any resales of presale spots occurred yet? Any guesstimates as to real-world condo fees? A family member may be considering a 2-bedroom.

EDIT:

That was reply #1000 for this thread. :)
 

Automation Gallery

Superstar
Member Bio
Joined
May 5, 2007
Messages
12,654
Reaction score
3,269
Location
South Parkdale
Does someone have a link to the zoning application for the high rise?

I wonder if this is related to the future Pier 27 tower.

Currently, Clewes is working a tower for the Toronto waterfront — “that’s going to have enormous balconies” — that will use a special structural system not used in the city for a long time. “It allows you to do enormous cantilevers to create what will really be outdoor rooms.”

http://www.yourhome.ca/homes/outdoorliving/article/805103--outdoor-spaces-in-the-sky
 

barrytron3030

Active Member
Member Bio
Joined
Dec 17, 2008
Messages
901
Reaction score
3
from today. i tried to film the shoring happening on site but the construction crew promptly told me to stop.