http://pembertongroup.com/time-and-space-community/construction-update/ notices Pembertong group website update the construction update, it looks they plan to finish the construction around Jan 2023.
Under construction management plan tab, it is in stage one now.
===========================================================================
- Stage one: This will involve temporary chain link fence comes with screen to allow for internal shoring drilling as the installation of a permanent plywood hoarding will impede heavy equipment at the perimeter. In addition to the temporary fence, rolling scaffold overhead protection will be used on the sidewalks with pedestrian control personnel stationed at the rolling scaffolding when required.
Start: August 2018 End: May 2019
- Stage two: Upon shoring drilling completion and prior to bulk excavation start the temporary chain link fence will be replaced with plywood hoarding and overhead protection at the perimeter of the site. The estimated date for delivery of public art on hoarding will take place post hoarding and overhead protection completion and as approved by local Councillor.
Start: April 15, 2019 End: September 2022
- Stage three: Upon completion of the all exterior assemblies and prior to streetscape construction the plywood hoarding will be removed and a temporary fence provided.
Start: September 2022 End: January 2023
All gates will be locked during hours where no construction activity is occurring. Appropriate signage will be installed to ensure that the safety of pedestrians, cyclists and motorists is considered at all times. Adjacent sidewalks with overhead protection will have appropriate lighting to ensure adequate visibility at all times of the day and night.