Last slab pour was July 29, 2021. So just under 4 months for the last level.
Golly, where does the time go?
Last slab pour was July 29, 2021. So just under 4 months for the last level.
Shafts of some sort?i wonder what the unpoured areas near the elevators are for
I believe those were just temporary stiffeners to keep things square prior to pouring since it was 50 feet high thin metal.Shafts of some sort?
...they also appear to be removing some of the brackets/braces from the central columns.
i wonder what the unpoured areas near the elevators are for
Looking at the schematics for the residential floors, it does specify that the area is for a garbage room:I think the bigger gap is for a staircase. The smaller one could be for recycling/garbage chute?
Because they want to give us the time to savor every detail of Benito's and Johnny Au's excellent photos before moving on to the next floor...anyone have an idea and can enlighten us on why the pace of the building is super slow? is it going to be like this for the remainder of the building, is it going to pick up?