One more. Mechanical levels are 17 and 18.How many more floors of the mechanical levels before the next habitable storeys are poured?
One more. Mechanical levels are 17 and 18.How many more floors of the mechanical levels before the next habitable storeys are poured?
I still say a Tim Hortons lol
Don't forget your optimum card: Shopper‘s Drugmart usually installs flagship stores at all the best spots in Toronto.
A Starbucks Reserve Roastery would be quite special…
How many more floors of the mechanical levels before the next habitable storeys are poured?
Not sure if it's panels all the way down or if they're going to have stone pedestals at the bottom of those columns, but they'd probably want to leave the bottom panels off until they're basically finishes the project. Otherwise they'd just get destroyed and need to be replaced anywaycurious why the blueskin & insultation for the columns stops about 4 feet above the ground
I believe it is 2 levels?How many more floors of the mechanical levels before the next habitable storeys are poured?
I think you are two levels short here - I believe the next level is actually the first condo floor. Still appreciated, regardless!Bit of a hack job, this one. Life's been a little bit hectic so apologies for the delay (and drop in detail!)
View attachment 439326
Counted the levels on the last screen shot so not sure how I could be two floors off, but I could have misinterpreted how many floors the shrouding for the upper floors actually is...I think you are two levels short here - I believe the next level is actually the first condo floor. Still appreciated, regardless!
Counted the levels on the last screen shot so not sure how I could be two floors off, but I could have misinterpreted how many floors the shrouding for the upper floors actually is...
Like I said, a bit of a hack job and likely will stop putting these up as I seem to be getting them more and more wrong
Correct. The current wall and column forms are for seventeen. From the floor plans it looks like at least one side is open the full two levels. This is where I'll miss Benito's view as they work through these two floors (but then there is BloorMan...).I don’t think it is off by 2 floors but 1. Your schematic shows that it is done up to the 17th floor. They just poured the columns above floor 17 and will be going into 18 (not sure if 18 has a full floor or just continuation of 17.)
Bit of a hack job, this one. Life's been a little bit hectic so apologies for the delay (and drop in detail!)
View attachment 439326