dodgeram
Active Member
Do you live in the penthouse at One Bloor? We need you for when this gets taller
Do you live in the penthouse at One Bloor? We need you for when this gets taller
To my understanding, 8 was the last floor before they capped the Koalumn iron works. 9 is the floor where said Koalumns where capped. 10 currently is the floor above said Koalumns caps. And now they're building up the supports for 11...At the risk of being pedantic, I believe this is level 9. They're off their current pace of one pour per week (slab then walls) due perhaps to the new super column process, but still moving along nicely.
Do you live in the penthouse at One Bloor? We need you for when this gets taller
The main elevator core is in the middle, but the type of construction has them being built after the floors, opposite to most building construction.Where is the elevator shaft for the hotels floors and condo floors higher up?
...I guess I'll have to wait for @Contra to drop another of his vector diagram updates so I can count the floors properly. It's amazing how easy is for me to lose track of counting such. /sighHere’s my count:
6 is the top of the retail podium/pool deck.
7 is the last level of the elevator podium, opens to the rooftop garden, and first level of hotel rooms (lower ceiling heights).
I believe we are now on the third level of hotel rooms…
Yes, I see the condo elevators on the plan but usually the shafts are much more visible during the construction process which is not the case here.And although the hotel elevators are outside the core, they will need the floors built inside the core to be able to access the rooms.
View attachment 395832
So each floor in the centre core portion of the tower to this point is removeable decking which will continue up to levels 20/21?They stopped pouring the condo elevator shaft walls after the sixth level, and have just been building decking in that area (for work space?). As tstormers posted above they will coming back to build out the core later. I read previously that they will be dropping in the elevators around levels 20/21.
Here are a few photos from 7:30 this evening. They were unloading the flatbed truck and doing concrete work at the same time.
View attachment 396083View attachment 396084View attachment 396085