With the spare “rock” they created a new level platform for the drilling rig to complete one more row of tie backs on the south wall. More metal plates were welded to the steel columns. I’m not sure if they are selective or if the whole east wall and maybe the south wall will require plates. No sign of a crane base from my angle.
This “residential” crew is working at “commercial” building speed. Top notch from my view point! Working lots of hours and taking advantage of the weather while they can.
The days are getting longer now.