Toronto St Lawrence Condos at 158 Front | 91.44m | 26s | Cityzen | a—A

I was in the area today and in the interest of saying something positive it looks like a lot is happening now. In addition the pile driver there was a large front end loader working.

Nice to see the progress and thanks for posting the jpegs
 
I was in the area today and in the interest of saying something positive it looks like a lot is happening now. In addition the pile driver there was a large front end loader working.

Nice to see the progress and thanks for posting the jpegs

The equipment you were referring to was not a pile driver - it is a Shoring Machine.

While the end objective is the same - creation of retaining wall which allows for the below grade portions of a building to be constructed without any intrusion from the perimiter of the site, the difference between in shoring and pile driving is quite pronounced.

Pile Driving involves hammer blows against the top of a steel 'I' beam to hammer it into the ground to the required depth. Pile driving results in major ground based vibration and can result in consequential damage to any building structures in the area. Pile driving does not take place in downtown Toronto - it is too disruptive. The most recent incident in which pile driving was used is outside of downtown - the grade separation for the Barrie line in the Junction area - lots of issues (as well noted in Urbantoronto comments), and that wasn't even downtown.

Shoring machines use a auger to excavate a cylindrical hole in which either a steel 'I' beam may be inserted for use in a lagging based retaining wall, or filled with concrete as part of a shotcrete based retaining wall system. The major disruption from shoring activities is the noise when the augur is extracted and then rotated, to and from, to expel the accumulated earth from the drill bit.

While the differences in terminology may confuse some people on Urbantoronto, shoring machines and pile drivers are really are two completely different ways of building retaining walls for the excavation and construction of below grade structures.
 
Last edited:
November 27. 2017
IMG_8763.jpg


IMG_8765.jpg


IMG_8773.jpg
 

Attachments

  • IMG_8763.jpg
    IMG_8763.jpg
    240.2 KB · Views: 678
  • IMG_8765.jpg
    IMG_8765.jpg
    311.1 KB · Views: 683
  • IMG_8773.jpg
    IMG_8773.jpg
    252.7 KB · Views: 678
Thanks Razz!! Great shots. I've said this before, but for us that don't get to the city often, but are looking forward to it when this project is complete, it's great to get these updates.
 
I am looking forward to seeing the construction progress on this one! There is some exciting development along Front Street East.
 
Yesterday

A1006B3C-6D8D-40CB-A409-25E4EB2D6B6D.jpeg


D0E5F723-FCE8-451B-BB95-DF2A584A3DD0.jpeg
 

Attachments

  • A1006B3C-6D8D-40CB-A409-25E4EB2D6B6D.jpeg
    A1006B3C-6D8D-40CB-A409-25E4EB2D6B6D.jpeg
    654.3 KB · Views: 620
  • D0E5F723-FCE8-451B-BB95-DF2A584A3DD0.jpeg
    D0E5F723-FCE8-451B-BB95-DF2A584A3DD0.jpeg
    608.2 KB · Views: 691
I was walking by Thursday Jan 11th and see the shorings are coming along nicely and there is lots of concrete being delivered.
20180111_111929[1].jpg
20180111_111849[1].jpg
20180111_103756[1].jpg
20180111_103714[1].jpg
 

Attachments

  • 20180111_111929[1].jpg
    20180111_111929[1].jpg
    158.3 KB · Views: 640
  • 20180111_111849[1].jpg
    20180111_111849[1].jpg
    214.3 KB · Views: 644
  • 20180111_103756[1].jpg
    20180111_103756[1].jpg
    189.4 KB · Views: 641
  • 20180111_103714[1].jpg
    20180111_103714[1].jpg
    208.2 KB · Views: 585
Last edited by a moderator:

Back
Top