Toronto Sonic and SuperSonic Condos | 96.31m | 30s | Lindvest Properties | Arcadis

the 2 proposed towers will sit directly north/south of each other and located on the parcel west of the church property shown in the above aerial photo, Wilket Creek Road will be extended west to connect with the existing Forester's private laneway, on the portion south of the church there will be a block of stacked townhouses / park / new street / another block of stock townhouses (not shown in above rendering)

Effectively the Lindvest parcel creates an L that wraps around the church that is truly midblock with no frontage on Rochefort, Don Mills nor Eglinton. Forester's surface parking lot at NW corner of Rochefort and Ferrand do not form a part of this project and will remain.

correction: the new east-west street does not line up perfectly with Wilket Creek Road but instead is slightly offset to the north
 
Last edited:
the 2 proposed towers will sit directly north/south of each other and located on the parcel west of the church property shown in the above aerial photo, Wilket Creek Road will be extended west to connect with the existing Forester's private laneway, on the portion south of the church there will be a block of stacked townhouses / park / new street / another block of stock townhouses (not shown in above rendering)

Effectively the Lindvest parcel creates an L that wraps around the church that is truly midblock with no frontage on Rochefort, Don Mills nor Eglinton. Forester's surface parking lot at NW corner of Rochefort and Ferrand do not form a part of this project and will remain.
If that is the case, this project is excellent filler.
 
Ah so the city owns the parcel at the SE corner of Don Mills-Eglinton. Must be used for the Crosstown construction.

I was worried we would be getting townhouses in that location, which I feel is not appropriate. But at this location by the church, it will be a good addition, sort of like The Berwick at Yonge-Eglinton.
 
The developer went with HP for B Street Condos; why not go with them here, or another quality firm? Why is it that the suburbs always get P+S and Kirkor galore? Is the thinking that suburbanites are less sophisticated and therefore have lower expectations?

Yes.
 
April 15 site visit.



IMG_2212.JPG


IMG_2213.JPG


IMG_2214.JPG
 

Attachments

  • IMG_2212.JPG
    IMG_2212.JPG
    2.8 MB · Views: 742
  • IMG_2213.JPG
    IMG_2213.JPG
    2.1 MB · Views: 744
  • IMG_2214.JPG
    IMG_2214.JPG
    2.7 MB · Views: 745
Update:
New development is intensifying along the future route of Toronto's new Crosstown LRT in advance of the line's 2021 opening. Just southeast of the future Science Centre (formerly Don Mills) Station at Don Mills and Eglinton, the latest residential development to begin site preparation is Lindvest's Sonic Condos, which saw its first activity a few weeks ago when shoring rigs arrived on site.
 

Attachments

  • IMG_1168.JPG
    IMG_1168.JPG
    906.8 KB · Views: 687
  • IMG_1169.JPG
    IMG_1169.JPG
    807.4 KB · Views: 662
  • IMG_1172.JPG
    IMG_1172.JPG
    1.7 MB · Views: 708
  • IMG_1214.JPG
    IMG_1214.JPG
    1.3 MB · Views: 706
IMG_8269.JPG
IMG_8267.JPG
IMG_8273.JPG
IMG_8266.JPG
 

Attachments

  • IMG_8269.JPG
    IMG_8269.JPG
    248.9 KB · Views: 708
  • IMG_8267.JPG
    IMG_8267.JPG
    207.7 KB · Views: 686
  • IMG_8273.JPG
    IMG_8273.JPG
    240.5 KB · Views: 652
  • IMG_8266.JPG
    IMG_8266.JPG
    221.1 KB · Views: 661

Back
Top