Mississauga Pinnacle Uptown: Crystal Condominiums | 167m | 28s | Pinnacle | Richmond Architects

Oh it's possible nobody did screenshots. I used to do those, but I figured the screenshots were already in the PDF, and don't want to deal with copyright infringement haha.
 
There is to be retail at ground level. "TOO" much retail can kill off existing ones as well having empty unites.
 
There is to be retail at ground level. "TOO" much retail can kill off existing ones as well having empty unites.

That's generally the case when they're shoebox style units ... have a look at NYCC - south of finch, though things are getting filled up slowly there's soo much retail available for lease at the bottom of 2/3 new buildings finished in the year or so!

And NYCC has a lot more foot traffic, so you can imagine in MCC - I hate these units - but for developers it's the way to go - eventually they get leased - sometimes they're not too bad - if you take a look at some of the units in NYCC you'll see sushi joints / small cafes ... sometimes it turns out OK but it generally takes a long time.
 
from today's Daily Commercial News, info on the architects...(for phase 1)....

CONDOMINIUM BUILDINGS, TOWNHOUSES Proj: 9106773-4
Mississauga, Peel Reg ON WORKING DRAWINGS
Block One, Eglinton Ave W, Hurontario St, Cooksville Creek, L5R
$72,000,000 est

Start: October, 2010 Complete: October, 2011
Note: Working drawings are underway. Schedules for tender for Gen Cont and construction will be finalized early Fall, 2010. Construction schedules are expected Fall, 2010. Further update September, 2010.

Architect for the project has changed. Hariri Pontarini Architects completed the approvals and Preliminary design and are no longer involved in the project. E.I Richmond Architect are undertaking completion of the Working drawings.

Project: concrete foundation, structural steel frame, fuel fired heating system, proposed construction of two condominium buildings. The proposed buildings will be a 25 storey building with 352 units and a 28 storey building with 425 units. Also included in this block will be ten townhouse units in one structure with an area of 24,542 sq ft. This is the first block of the Residential development followed under report number 9096327.
Scope: 667,754 square feet; 28 storeys; 2 storeys below grade; 3 structures; 435 units; 2 acres
Development: New
Category: Apartment bldgs
 
from Daily Commercial News, posted with the usual caveat, info on phases 2-8.......

RESIDENTIAL, COMMERICIAL, OFFICE DEVELOPMENT Proj: 9096327-5
Mississauga, Peel Reg ON PREPARING PLANS
Blocks 2 to 8, Eglinton Ave W, Hurontario Street, Cooksville Creek, L5R
$375,400,000 est

Note: This project is on hold. Owner is seeking City Council site plan approvals. Council site plan approvals for Phase One, report number 9106773 are in place. Schedules for approvals, Working drawings, tender and construction of subsequent blocks are undetermined pending completion of Block One. Further update early Fall 2010.

Architect for the project has changed. Hariri Pontarini Architects completed the approvals and Preliminary design and are no longer involved in the project. E.I Richmond Architect are undertaking completion of the Working drawings.

Project: proposed construction of a mixed-use development. Block Two will include one mid-rise apartment tower, ranging in height from 6-12 storeys with a maximum area of 127,950 sq ft, 128 residential units and retail space at grade level; One 18 storey 145,529 sq ft apartment building with 159 units and retail space at grade level; One 25 storey, 204,283 sq ft apartment tower with 225 units; and one 50 storey 406,876 sq ft apartment tower with 450 units. Also included will be eight 4-storey, three bedroom townhouse units in one block with a maximum area of 19,633 sq ft. Block Three will include one 18-storey, 145,420 apartment tower with 159 units and retail space at grade level; One 42-storey, 367,318 sq ft apartment building with 429 units and retail and office space at grade level; and one 42-storey 367,318 sq ft apartment building with 429 units and retail and office space at grade level. This Block may also include a private amenity block for residents with recreation space for residents and further retail space. Block Four will include one midrise 12-storey, 136,917 sq ft apartment building with 168 units. One 18-storey, 149,930 sq ft apartment building with 159 units and retail space at grade level. One 42-storey 386,209 sq ft apartment tower with 429 units and retail and office space at grade level. Block Five will include one midrise 12 storey 145,388 sq ft apartment building with 88 units and retail space at grade level. One midrise 6-12 storey, 190,671 sq ft apartment building with 279 units. 41 three-storey townhouse units, with a total area of 50,310 sq ft. The project will also include construction of public parkland and green space in blocks six, seven and eight. Block One; a 25 storey apartment building with 352 units and a 28 storey apartment tower with 425 units and ten townhouse units in one structure will now be followed under report number 9106773.

Scope: 3,443,756 square feet; 32 storeys; 15 structures; 3408 units; 5 hectares
Development: New
Category: Apartment bldgs; Retail, wholesale services; Shopping centres, plazas, malls; Commercial offices
 
^thx for the post
This is from Sunday. Don't know if the equipment is going to be used to build the sales centre or if the gas station is due to be redone, etc...we'll see...
20100808008.jpg
 
Any of the renderings and/or proposals show the gas station remaining as it is.

If they can't persuade him to relocate, it would be nice if they were able to upgrade and maybe build a more permanent c-store on the inside corner of the property, as opposed to the smaller structure that is now located towards the outer corner, and do something to make the pedestrian corner a little more appealing.
 
from urbanation's twitter feed, looks like Pinnacle will be branding this project 'Uptown Mississauga'....

176873749.jpg
 
Last edited:
^ Thx for the info. Here are the DCN entries for today...

http://www.dailycommercialnews.ca/cgi-bin/top10.pl?rm=show_top10_project&id=4ecee4a5e012858b660bed47079683c22f6556ff&projectid=9096327&region=ontario

RESIDENTIAL, COMMERICIAL, OFFICE DEVELOPMENT Proj: 9096327-6
Mississauga, Peel Reg ON PREPARING PLANS
Uptown Mississauga, Blocks 2 to 5, Eglinton Ave W, Hurontario Street, Cooksville Creek, L5R
$375,400,000 est
Note: This project is on hold. Council rezoning approvals for Phase One, report number 9106773 are in place. Cons will seek site plan approvals for Phase One late 2010. Cons expects to seek rezoning approvals for the remainder of the site early early 2011. City Council site plan approval submissions will be made individually as projects proceed. Schedules for Working drawings, tender and construction of subsequent blocks are undetermined pending completion of Block One. Further update early Summer, 2011.
Project: proposed construction of a mixed-use development. Block Two will include one mid-rise apartment tower, ranging in height from 6-12 storeys with a maximum area of 127,950 sq ft, 128 residential units and retail space at grade level; One 18 storey 145,529 sq ft apartment building with 159 units and retail space at grade level; One 25 storey, 204,283 sq ft apartment tower with 225 units; and one 50 storey 406,876 sq ft apartment tower with 450 units. Also included will be eight 4-storey, three bedroom townhouse units in one block with a maximum area of 19,633 sq ft. Block Three will include one 18-storey, 145,420 apartment tower with 159 units and retail space at grade level; One 42-storey, 367,318 sq ft apartment building with 429 units and retail and office space at grade level; and one 42-storey 367,318 sq ft apartment building with 429 units and retail and office space at grade level. This Block may also include a private amenity block for residents with recreation space for residents and further retail space. Block Four will include one midrise 12-storey, 136,917 sq ft apartment building with 168 units. One 18-storey, 149,930 sq ft apartment building with 159 units and retail space at grade level. One 42-storey 386,209 sq ft apartment tower with 429 units and retail and office space at grade level. Block Five will include one midrise 12 storey 145,388 sq ft apartment building with 88 units and retail space at grade level. One midrise 6-12 storey, 190,671 sq ft apartment building with 279 units. 41 three-storey townhouse units, with a total area of 50,310 sq ft. Blocks 6, 7, and 8 will include construction of public parkland and green space. Block One; a 25 storey apartment building with 352 units and a 28 storey apartment tower with 425 units and ten townhouse units in one structure will now be followed under report number 9106773.
Scope: 3,443,756 square feet; 32 storeys; 15 structures; 3408 units; 5 hectares
Development: New
Category: Apartment bldgs; Retail, wholesale services; Shopping centres, plazas, malls; Commercial offices
First report Mon Feb 23, 2009. Last report Mon Aug 09, 2010.
This report Tue Oct 12, 2010.

http://www.dailycommercialnews.ca/cgi-bin/top10.pl?rm=show_top10_project&id=9c22b9d489b7fe7a444226bd263c94e0ed61f9df&projectid=9106773&region=ontario

CONDOMINIUM BUILDINGS, TOWNHOUSES Proj: 9106773-5
Mississauga, Peel Reg ON NEGOTIATED/WORKING DRAWINGS
Uptown Mississauga, Block One, Eglinton Ave W, Hurontario St, Cooksville Creek, L5R
$72,000,000 est
Start: June, 2011 Complete: June, 2012
Note: Working drawings are underway. Owner is finalizing Municipal site plan approvals. Schedules for completion of Working drawings, Sub trade tender and construction are undetermined pending occupancy. Further update early Summer, 2011.
Project: concrete foundation, structural steel frame, fuel fired heating system, proposed construction of two condominium buildings. The proposed buildings will be a 25 storey building with 352 units and a 28 storey building with 425 units. Also included in this block will be ten townhouse units in one structure with an area of 24,542 sq ft. This is the first block of the Residential development followed under report number 9096327.
Scope: 667,754 square feet; 28 storeys; 2 storeys below grade; 3 structures; 435 units; 2 acres
Development: New
Category: Apartment bldgs
First report Thu Sep 10, 2009. Last report Mon Aug 09, 2010.
This report Tue Oct 12, 2010.
 
Thx Jason! looks like they have zoning in place for phase 1, and are still working on the zoning for the later phases........this will be another large project, nearly as big as Amacon's Parkside Village..
 
Thx Jason! looks like they have zoning in place for phase 1, and are still working on the zoning for the later phases........this will be another large project, nearly as big as Amacon's Parkside Village..

Here are some left-over pictures from the other day. I will be taking similar pictures on Friday with this project in mind. In ten years time, Mississauga itself will have two "skylines" or clusters.
20101007015.jpg


20101007c004.jpg


20101007012.jpg
 
construction equipment onsite this morning! Looks like they are putting in sewer/watermains....
 