Developer: Solmar Development Corp
Architect: Rosario "Roy" Varacalli, Cusimano Architect
  
Address: 24 Elm Dr W, Mississauga
Category: Residential (Condo)
Status: ConstructionCrane(s): 1
Height: ? ft / ? mStoreys: 40 storeys
Project Forum 628 posts
Real Estate Forum 33 posts
Follow 6 followingUpload 493 photos
Official WebsiteReport Error


Developer: Solmar Development Corp
Architect: Rosario "Roy" Varacalli, Cusimano Architect
  
Address: 24 Elm Drive West, Mississauga
Category: Residential (Condo)
Status: ConstructionCrane(s): 0
Height: ? ft / ? mStoreys: 50 storeys
Project Forum 628 posts
Real Estate Forum
Follow 4 followingUpload 29 photos
Official WebsiteReport Error


Mississauga Oro at Edge Towers | ?m | 50s | Solmar | Rosario Varacalli

I'd have to go through my photos but I think the top floor is mechanical with a double height window belt.
Why would the mechanical floor lights be left on all night every night? Actually that might make sense more than someone leaving the lights on to go to bed. But that’s one dumb way to burn condo fees.
 
Why would the mechanical floor lights be left on all night every night? Actually that might make sense more than someone leaving the lights on to go to bed. But that’s one dumb way to burn condo fees.
That, sir, is above my pay grade.
 
Now what 9th floor are you on as there are 2 towers?? Are you in the short one or the 50??

At the rate they been gong for all 3.5 towers so far, need to add 6-12 months to the date. T3+ was to be at grade from July-Sept depending who you talked to as well from my background experience, yet there we are in November and still not at grade.

The building maybe top off by the end of 2025, but more like winter 2026. The elevators will not be in place until summer-fall of 2026. I don't know if there are elevators for the short tower, otherwise, a long wait for an elevator when fulling move in. Anything over 100 residents to one elevator means longer waiting time.

End of the day at this time, your move in is late 2026 to Spring 2027 sorry to say
Is the building to grade as of yet, are there any pics to reflect where things are in Jan of 2025.

Looking forward to hearing from you!
 
Is the building to grade as of yet, are there any pics to reflect where things are in Jan of 2025.

Looking forward to hearing from you!
The building was at grade before Christmas and working on the 2nd floor

The photos for Nov are now on line with Dec shots in my backlog.
 
Is the building to grade as of yet, are there any pics to reflect where things are in Jan of 2025.

Looking forward to hearing from you!
In passing while flying to a different project on December 28th:
1735942338564.jpeg

There might be other shots posted once I clear my December 27th and earlier December 28th backlog.
 
Jan 19
Lot more up on my site not only for the 19th, but December as well.
Those who are moving into this last tower, it will not happen until Q3-Q4 of 2026 depending on your floor as they have yet to have support columns and walls in place for the 2nd floor and may see the second floor pour by the end of February.

Still lost how you will drive in/out of the building as it not where it was supposed to be and if opposite the driveway entrance for T2, some real hard turns to do it. The other option is you will use T2 entrance to gain access, but saw no openings in both walls as the second wall was being poured, other than saw cutting an opening at a later date. At the same time, looks like parking will be on the second floor as well
54283293106_ef6dab9611_b.jpg

54282405702_e6b1c4af23_b.jpg

54283540023_4aec37cfee_b.jpg

54283293286_f8fded0249_b.jpg

54283293331_30300b4835_b.jpg

54283293111_0194e61309_b.jpg
 
Hey @drum118,

Thanks for this update.

Would you mind linking your site? I would love to check out the other updates you were talking about.

Looking forward to hearing from you!
 
Hey @drum118,

Thanks for this update.

Would you mind linking your site? I would love to check out the other updates you were talking about.

Looking forward to hearing from you!
Its at the the bottom of my posting, but here site https://www.flickr.com/photos/drum118/ There are albums for most projects including this one that has all the photos from the day I started shooting the sites or what.
 
Feb 20
We will not see the second floor for T3 this month and maybe not in March fully in place. They have a fair amount of support structure to support the second floor, mainly to the north end. By the looks of the south end, there is a ramp to go up to the second floor for parking and I could be wrong until I see more framing.

This means that the building will not be top off until Q2 of 2026 and pushing move in to late Q4 or Q1 2027 with the bulk in 2027.
 
March 9
Took couple of shots of the site today and was right about parking on the second floor for the south end as to can see the ramp has been poured. A few more support walls are now up, but looks like still more to come. The second floor may not be pour this month and pushing move in down the road.
54378620098_22563fb430_b.jpg

54378780400_d99e8a54f8_b.jpg
 
March 11
Found out today that there will be 5 level of parking above grade and that going to slow the building of the 12 story more. A second crew is now been added to the project to speed thing up. Still doing form to support the second floor.

As to parking, the plan that show a road at the south west corner is for garbage trucks and move in/out only. As someone noted, the driveway into/out of the building is direct from T2 tower driveway and looks like a column got built in the wrong location that will have to be removed to to use that area for the driveway.

More photos up on my site
54381718825_6c5ccbb8e5_b.jpg

54381524039_41c0540e87_b.jpg

54381328446_ba5ca19027_b.jpg

54380449437_6814af4e9c_b.jpg

54381523849_a36d178b2e_b.jpg

54381718720_3724842b04_b.jpg
 
March 11
Found out today that there will be 5 level of parking above grade and that going to slow the building of the 12 story more. A second crew is now been added to the project to speed thing up. Still doing form to support the second floor.

As to parking, the plan that show a road at the south west corner is for garbage trucks and move in/out only. As someone noted, the driveway into/out of the building is direct from T2 tower driveway and looks like a column got built in the wrong location that will have to be removed to to use that area for the driveway.

More photos up on my site
54381718825_6c5ccbb8e5_b.jpg

54381524039_41c0540e87_b.jpg

54381328446_ba5ca19027_b.jpg

54380449437_6814af4e9c_b.jpg

54381523849_a36d178b2e_b.jpg

54381718720_3724842b04_b.jpg
These updates are incredible! So thankful for them!
 

Back
Top