Would also love to see some progress shots at Progress ave of the line 2 extensionNothing pretty, but here are some progress shots.
Would also love to see some progress shots at Progress ave of the line 2 extensionNothing pretty, but here are some progress shots.
yea those on the east side have been there for awhile. Was complete like a year ago.These are the supports for the bridge over the Don. Taken 18 December.
View attachment 620581
View attachment 620582
Thanks! Do you know when the west one went in?yea those on the east side have been there for awhile. Was complete like a year ago.
least 6 months if not earlierThanks! Do you know when the west one went in?
yea those on the east side have been there for awhile. Was complete like a year ago.
The bottom portion has been there about a year. The top half was done within the last few weeks.
Yes, two tunnels. Thanks to Exhibition portal renderings posted yesterday by @FrankietlsWill there be two? I'm thinking 7 meters wide isn't wide enough for two trains to fit in side by side, but maybe I'm wrong.
A 7m TBM will leave the inner tunnel diameter around 6.2m as the tunnel liners take up 40cm each side. A train is over 3m wide. To have 2 trains side by side will definitely not fit in a 6.2m diameter tunnel if you thought of the height on the edge. Plus having a 10 cm gap between two trains will definitely result in disaster. They need some space for tilting in curves and wear and tear tolerance.Will there be two? I'm thinking 7 meters wide isn't wide enough for two trains to fit in side by side, but maybe I'm wrong.