nfitz
Superstar
You say no hyperbole - but then you do it again.Alright, no hyperbole.
$13B for a "rapid" transit line that still has to stop at traffic lights is a joke!
The first 20-km has zero traffic lights. There's a 6.5 km section with traffic lights. So how much is that 6.5 km section costing compared to the other 20.5 km?
(and if they hadn't have put that stupid light at Leslie, there'd be only 5 km with a few traffic lights).