So the Porsche dealership at Front & Parliament was expropriated for the Ontario Line.

They've relocated to Parliament and Lakeshore.

Pretty crazy because they just finished a $7M renovation on the place last year and now the whole building is just going t be demolished.

Wonder how much it cost the government to buy it.
Weird. They just re-sealed and repainted the parking lot a month or two ago. Surely they knew they would be moving. Why bother?
 
One Atlantic Avenue is about to disappear for Ontario Line Early Works at Exhibition Station. The billboards are down, and the hoarding is up.

B34D52BB-78CE-4B83-A938-623734D41D40.jpeg
 
The demolition permit for the building was submitted November 23 but has not yet been issued according to the City's website. I imagine it'll be issued soon.

Notably, permits were also filed in September for the new temporary Exhibition structure that has been detailed in this thread before. That permit is listed as "examiners notice sent".

Notably, there are also demolition permits filed for the Porsche and Nissan Dealers as well as the Staples and Budget Rent-a-car at Corktown Station and those have actually been issued. Expect those demolitions to start very, very soon.
 
Last edited:
Metrolinx will also be facilitating TTC installation of additional streetcar tracks on York Street to provide a detour for the TTC Queen 501 streetcar during construction of the Queen station.
A little off topic, but did this need an EA? If not, why can't we just get building additional streetcar trackage elsewhere in the City
 
A little off topic, but did this need an EA? If not, why can't we just get building additional streetcar trackage elsewhere in the City
there are certain qualifiers that trigger EA requirements - a small ~150 metre single track in an existing vehicle lane isn't going to trigger an EA like a new LRT line across multiple km with road widenings, property requirements, etc.

The impact is just too minor here, especially with Ford's changes to the EA act which exempt a lot of smaller projects from EAs now.

The TTC is also re-laying streetcar tracks basically right across Adelaide this summer without an EA between Charlotte and Victoria, though much of that is restoring old tracks.
 
Also, the exhibition demolition permit is now listed as "issued" on the city's website.

Let the subway construction begin!

Did they ever finish the snails pace Exhibition GO construction that had been going on for the past decade? Funny to think after that we are going to be tearing a lot up there again.
 
Did they ever finish the snails pace Exhibition GO construction that had been going on for the past decade? Funny to think after that we are going to be tearing a lot up there again.
that construction project has been sitting abandoned since 2016. It was procured prior to the GO Expansion program and once GO realized Exhibition Station would need to be substantially revised, they basically just stopped construction and cut their losses. There hasn't been active construction at Exhibition in over 5 years at this point.

A lot of what was done in 2013-2016 is basically just going to get ripped out now. And rightfully so, it was a crappy project.
 