AlbertC Superstar Member Bio Joined Apr 24, 2007 Messages 22,619 Reaction score 61,475 Location Davenport May 16, 2022 #106
The Preservationist Active Member Member Bio Joined Jun 26, 2020 Messages 548 Reaction score 1,412 Location Toronto May 16, 2022 #107 Well that oozes class... I take it that's limestone on the first two levels and precast concrete panel above?
Well that oozes class... I take it that's limestone on the first two levels and precast concrete panel above?
C Cryptopreneur Active Member Member Bio Joined Oct 1, 2019 Messages 149 Reaction score 152 May 16, 2022 #108 Not sure why they went for the two tone look.... the top colour doesn't suit the building at all... they should've sticked with the bottom colour. Also, the window frames look very cheaply done... disappointing build IMO.
Not sure why they went for the two tone look.... the top colour doesn't suit the building at all... they should've sticked with the bottom colour. Also, the window frames look very cheaply done... disappointing build IMO.