AlbertC Superstar Member Bio Joined Apr 24, 2007 Messages 22,283 Reaction score 60,165 Location Davenport May 16, 2022 #106
The Preservationist Active Member Member Bio Joined Jun 26, 2020 Messages 539 Reaction score 1,357 Location Toronto May 16, 2022 #107 Well that oozes class... I take it that's limestone on the first two levels and precast concrete panel above?
Well that oozes class... I take it that's limestone on the first two levels and precast concrete panel above?
C Cryptopreneur Active Member Member Bio Joined Oct 1, 2019 Messages 149 Reaction score 152 May 16, 2022 #108 Not sure why they went for the two tone look.... the top colour doesn't suit the building at all... they should've sticked with the bottom colour. Also, the window frames look very cheaply done... disappointing build IMO.
Not sure why they went for the two tone look.... the top colour doesn't suit the building at all... they should've sticked with the bottom colour. Also, the window frames look very cheaply done... disappointing build IMO.