Toronto Maverick | 154.53m | 49s | Empire | Arcadis

Hi guys, I saw units on the 25th floor and below are already occupied. Does anyone know how much the monthly occupancy fee is for a 1 bedroom unit? When is the final closing date?
 
Hi guys, I saw units on the 25th floor and below are already occupied. Does anyone know how much the monthly occupancy fee is for a 1 bedroom unit? When is the final closing date?

Wrong thread.

 
July 9: Major work on the King Street sidewalk, with the traffic on King Street being held while pedestrians are directed to the north sidewalk on King Street to get around the construction.

20240709_125712.jpg
 
Just wonderful to see these facades properly cleaned up, if the streetscape is 1/2 way decent this will be quite good..

I have to say, when @AHK and @PMT are on a roll on the same night, keeping up with them is a calorie-burner.
 
The execution of the facades are beautiful... I just hope they become home to a decent restaurant or cafe and not another weed dispensary eyesore
 
Exactly, it doesn't look luscious enough for Toronto Hydro to make their cuts. They'd rather wait until that fresh smell of concrete is piping out and that's when they'll come out in full force for the utility cut.
...even doing it while wearing shite-eating grins, lol.
 
Last edited:
August 7 - A long time coming, but the sidewalk in front of Maverick is finally getting close to the finish line. Concrete is complete, the decorative stone section along the street edge is in progress, and the landscape contractor is preparing the sidewalk planters.

20240807_131500.jpg


20240807_131400.jpg
 

Attachments

  • 20240807_131640.jpg
    20240807_131640.jpg
    381.8 KB · Views: 36
  • 20240807_131508.jpg
    20240807_131508.jpg
    241.1 KB · Views: 31

Back
Top