Toronto Lotus Condos | 42.06m | 12s | Chestnut Hill | Kirkor

Update:
October, 2017
The sold out Lotus Condominiums is slated for completion in 2018, with construction reaching the 8th floor in September. Chestnut Hill expects the building to be topped off by the end of the year. The grade-level retail and commercial space at Lotus was sold in September.
 
I wasn't sure that Sheppard Avenue was still there (no photos in months) so I decided that in a middle of the snow, I'd go check. It's still there, and Lotus looks topped out to me.

DSC06626.jpg
DSC06627.jpg
DSC06631.jpg


42
 

Attachments

  • DSC06626.jpg
    DSC06626.jpg
    251.2 KB · Views: 665
  • DSC06627.jpg
    DSC06627.jpg
    330.9 KB · Views: 720
  • DSC06631.jpg
    DSC06631.jpg
    258.9 KB · Views: 723

Back
Top