Toronto L-Tower | 204.82m | 58s | Cityzen | Daniel Libeskind

The outside structure looks almost completed. Are they still planning to move the first people in June or should we expect further delay?
 
SZygC3r.jpg


eCxtibv.jpg
 
right now, it looks as though the crane is the
tallest thing in the downtown core.....lol
CIMG7686.jpg


l-CIMG7937.jpg



l-CIMG7939.jpg



l-CIMG7943.jpg


from the college along the water, dirty windows.
l-CIMG7946.jpg
 

Attachments

  • CIMG7686.jpg
    CIMG7686.jpg
    96.7 KB · Views: 2,429
  • l-CIMG7937.jpg
    l-CIMG7937.jpg
    97.7 KB · Views: 2,394
  • l-CIMG7939.jpg
    l-CIMG7939.jpg
    95.5 KB · Views: 2,410
  • l-CIMG7943.jpg
    l-CIMG7943.jpg
    95.3 KB · Views: 2,419
  • l-CIMG7946.jpg
    l-CIMG7946.jpg
    95.1 KB · Views: 2,424
Thanks for posting the picture. See a line of metal clips.. not sure if they are used for mounting the top row of windows. Will look cool at night if there are trendy lighting at the rooftop :)
 
From the Islington Avenue bridge over the Willowbrook yards:

P1390360.jpg


42
 

Attachments

  • P1390360.jpg
    P1390360.jpg
    92.8 KB · Views: 1,494

Back
Top